Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
TLIB3099 Mapping and Delivery Guide
Examine track infrastructure
Version 1.0
Issue Date: April 2024
Qualification | - |
Unit of Competency | TLIB3099 - Examine track infrastructure | |
---|---|---|---|---|
Description | ||||
Employability Skills | ||||
Learning Outcomes and Application | This unit involves the skills and knowledge required to examine track and right of way infrastructure in accordance with safeworking and regulatory requirements, and workplace procedures. It includes preparing for examination, examining track and right of way, analysing examination results, and reporting findings. People achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice and/or guidelines.Work is performed under minimal supervision, generally within a team environment. It involves the application of routine operational principles and procedures when examining track infrastructure, as part of workplace activities across a variety of operational contexts within the Australian rail system.No licensing, legislative or certification requirements apply to this unit at the time of publication. | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
|
|||
Prerequisites/co-requisites | ||||
Competency Field | B – Equipment Checking and Maintenance |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare for examination | ||||||||
Element: Examination task is reviewed to establish requirements | ||||||||
Element: Hazards are identified, risks are assessed and control measures are implemented | ||||||||
Element: Equipment appropriate to task is selected and checked for correct operation in accordance with manufacturer instructions and workplace procedures | ||||||||
Element: Examine track | ||||||||
Element: Examination task is undertaken in accordance with workplace procedures | ||||||||
Element: Condition of track or right of way infrastructure being examined is recorded in accordance with workplace procedures | ||||||||
Element: Measurements of track or right of way infrastructure being examined are taken and recorded in accordance with workplace procedures | ||||||||
Element: Analyse examination results | ||||||||
Element: Available data is analysed to identify trends, defects or variations from allowable tolerances | ||||||||
Element: Appropriate action is taken to appropriately safeguard operation of the rail system | ||||||||
Element: Report findings | ||||||||
Element: Examination schedule or work report data is completed in accordance with workplace procedures | ||||||||
Element: Defects and deficiencies are reported to enable repairs to be effected in a timely manner | ||||||||
Element: Results of analysis are prioritised and reported to relevant personnel in accordance with workplace procedures | ||||||||
Element: Documentation is completed as required, in accordance with workplace procedures |