Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
TLIB4077 Mapping and Delivery Guide
Inspect and prepare a heritage steam locomotive
Version 1.0
Issue Date: April 2024
Qualification | - |
Unit of Competency | TLIB4077 - Inspect and prepare a heritage steam locomotive | |
---|---|---|---|---|
Description | ||||
Employability Skills | ||||
Learning Outcomes and Application | This unit involves the skills and knowledge required to inspect and prepare a heritage steam locomotive in accordance with relevant workplace practices, rail regulations and codes of practice.It includes checking and preparing a heritage steam locomotive, visually examining a locomotive, conducting in-cab checks, and moving and positioning a locomotive for service in accordance with workplace procedures. People achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice and/or guidelines.Work is performed under minimal supervision, generally within a team environment. No licensing, legislative or certification requirements apply to this unit at the time of publication. | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
|
|||
Prerequisites/co-requisites | ||||
Competency Field | B – Equipment Checking and Maintenance |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Light fire and raise steam | ||||||||
Element: Roster is checked and interpreted for day’s train driving activities | ||||||||
Element: Allocation of locomotives is checked in accordance with notices and in conjunction with network control officer and roster clerk | ||||||||
Element: Locomotive to be inspected and prepared is located in the yard | ||||||||
Element: Pre-light-up procedures applicable to the type of fire box are identified and followed to enable safe boiler operation | ||||||||
Element: Light-up procedures and safety practices are followed to build up steam within the boiler and to ensure 'smoking' is minimised | ||||||||
Element: Instruments and equipment are monitored to ensure safe and efficient operation as steam pressure is raised to operating level | ||||||||
Element: Where a problem is indicated, action is taken to determine the cause and to rectify or report the situation | ||||||||
Element: Prepare for heritage steam locomotive work activities | ||||||||
Element: Allocation of locomotives is checked as identified by notices and in conjunction with network control officer and roster clerk | ||||||||
Element: Hazards are identified, risks are assessed and risk control measures are implemented | ||||||||
Element: Trackside safety and basic electrification awareness procedures are followed while locating allocated locomotive in the yard | ||||||||
Element: Locomotive inspection and preparation duties are identified and interpreted | ||||||||
Element: Train schedules, notices and other operational and regulatory documentation are accessed and interpreted | ||||||||
Element: Communications equipment required for day’s operations is obtained and checked to ensure it is functional | ||||||||
Element: Required personal protective equipment is obtained for use prior to day’s train driving activities | ||||||||
Element: Inspect and prepare heritage steam locomotive | ||||||||
Element: Features, functions and location of locomotive and associated equipment are identified | ||||||||
Element: Logbook is checked to confirm serviceability of locomotive | ||||||||
Element: Preparation and safety checks are conducted, in accordance with work health and safety (WHS)/occupational health and safety (OHS) and other workplace policies and procedures | ||||||||
Element: Locomotive, kit and equipment are checked and defects and deficiencies are recorded and rectified, isolated, tagged or reported in accordance with workplace procedures and regulatory requirements | ||||||||
Element: Availability of appropriate fuel, lubricating oils, water and sand quantities are checked against journey requirements and appropriate action is taken to replenish them as required | ||||||||
Element: Relevant WHS/OHS and regulatory requirements are followed | ||||||||
Element: Conduct in-cab checks | ||||||||
Element: Locomotive is checked in correct sequence and all equipment is confirmed to be operating to optimum requirements | ||||||||
Element: Cab layout is checked and confirmed that it meets operating requirements | ||||||||
Element: Pre-departure mechanical checks are correctly performed and correct functioning of equipment is confirmed in accordance with workplace procedures and operating requirements | ||||||||
Element: Operational controls and indicators are checked to ensure they are functioning correctly and appropriate action is taken if they are not working correctly | ||||||||
Element: Communications equipment is checked to ensure it is functioning correctly and appropriate action is taken if it is not working correctly | ||||||||
Element: Auxiliary equipment is checked and is confirmed to be operational in accordance with operating requirements | ||||||||
Element: Fire extinguisher, safety equipment, emergency toolbox and any other required equipment are checked to confirm they are in position and meet operational requirements | ||||||||
Element: Pre-departure checks are carried out to ensure locomotive is braking and powering effectively and is safe to move | ||||||||
Element: Complete documentation | ||||||||
Element: Required documentation concerning inspecting, preparing and starting up locomotive is completed in accordance with workplace procedures and regulatory requirements | ||||||||
Element: Logbook and other service records on the locomotive are completed in accordance with workplace procedures and regulatory requirements | ||||||||
Element: Position heritage steam locomotive | ||||||||
Element: Authority to move and position locomotive is obtained and relevant personnel are advised of intention and procedures | ||||||||
Element: Locomotive is operated in accordance with standard procedures and regulatory requirements, within operating and operational constraints | ||||||||
Element: Locomotive is positioned in accordance with operational requirements and directions | ||||||||
Element: Locomotive performance is monitored during operation to confirm effective operation or to identify defects | ||||||||
Element: Equipment defects are identified, rectified and recorded or relevant personnel are advised for assistance | ||||||||
Element: Relevant WHS/OHS and regulatory requirements are followed to ensure safety and to prevent injury and damage | ||||||||
Element: Network control officer and other relevant personnel are advised that locomotive is secured in the required position and is ready for service |