Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

TLIC0005 Mapping and Delivery Guide
Close down rail traffic from autonomous operations

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency TLIC0005 - Close down rail traffic from autonomous operations
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to end the autonomous operation of rail traffic.It includes identifying rail traffic operating autonomously, ending autonomous rail traffic mission, and monitoring and reporting autonomous rail traffic status.This unit defines rail traffic as a train.People achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice and/or guidelines.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Assessors must hold credentials specified within the Standards for Registered Training Organisations current at the time of assessment.

Assessment must satisfy the Principles of Assessment and Rules of Evidence and all regulatory requirements included within the Standards for Registered Training Organisations current at the time of assessment.

Assessment must occur in rail workplace operational situations where it is appropriate to do so; where this is not appropriate, assessment must occur in simulated workplace operational situations that replicate rail workplace conditions.

Assessment processes and techniques must be appropriate to the language, literacy and numeracy requirements of the work being performed and the needs of the candidate.

Resources for assessment must include:

a range of relevant exercises, case studies and/or simulations

relevant and appropriate materials, tools, autonomous equipment and personal protective equipment (PPE) currently used in industry

applicable documentation, including legislation, regulations, codes of practice, workplace procedures and operation manuals.

Prerequisites/co-requisites
Competency Field C - Vehicle Operation
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Verify rail traffic that requires autonomous operation to be ended
  • Rail traffic mission is identified
       
Element: Autonomous rail traffic location is verified
       
Element: Hazards are identified, risks assessed and control measures implemented
       
Element: Rail traffic is accessed in accordance with workplace procedures
       
Element: Ending autonomous rail traffic mission
  • Autonomous rail traffic end of mission is determined
       
Element: Functions of equipment, component parts and accessories are identified
       
Element: Applications for autonomous activities of different infotechnology equipment and systems are interpreted
       
Element: Autonomous rail traffic system is disengaged and placed into passive state
       
Element: Safety critical communication is undertaken with network control officer or relevant person to validate autonomous rail traffic data in accordance with workplace procedures
       
Element: Situational awareness is applied through effective visual scans, use of communication systems, use of rail traffic information and use of system of safeworking in accordance with workplace procedures
       
Element: Routine faults in operating systems, software applications and operator errors are identified and reported in accordance with workplace procedures
       
Element: Rail traffic is secured
       
Element: Monitor and report autonomous railtraffic operations
  • Status of rail traffic operation is communicated in accordance with workplace protocols
       
Element: Effective communication is maintained with relevant personnel
       
Element: Records are updated in accordance with workplace procedures
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least one occasion and include:

accessing the danger zone safely in accordance with network safety management system

accessing the human machine interface and stop the autonomous mission

confirming it is safe to board the rail traffic

disengaging the autonomous systems

ensuring the rail traffic is secured, including three step protection and brakes applied

setting the rail traffic to manned operations

unlocking and accessing rail traffic.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

emergency response procedures

isolation systems

operational requirement of autonomous rail traffic, including rail traffic mission

relevant autonomous rail traffic workplace procedures and manufacturer specifications

relevant network safety management system

relevant work health and safety (WHS)/occupational health and safety (OHS) procedures and regulations

typical minor repair problems that can occur, and appropriate remedial action that should be taken

workplace documentation and record requirements.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Rail traffic mission is identified 
 
 
 
Autonomous rail traffic end of mission is determined 
 
 
 
 
 
 
 
Status of rail traffic operation is communicated in accordance with workplace protocols 
 
 

Forms

Assessment Cover Sheet

TLIC0005 - Close down rail traffic from autonomous operations
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

TLIC0005 - Close down rail traffic from autonomous operations

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: