Unit of Competency TLIC3034 - Berth and shut down an electric tram
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to berth and shut down an electric tram.It includes determining a required berthing location; berthing, shutting down and securing a tram; carrying out all required postoperational activities; and completing postoperational paperwork. People achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice and/or guidelines, as well as relevant tramway regulatory requirements.Work is performed under minimal supervision, generally within a team environment. It involves the application of routine operational principles and procedures when berthing and shutting down an electric tram, as part of workplace activities across a variety of operational contexts.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

As a minimum, assessors must satisfy applicable regulatory requirements, which include requirements in the Standards for Registered Training Organisations, current at the time of assessment.

As a minimum, assessment must satisfy applicable regulatory requirements, which include requirements in the Standards for Registered Training Organisations current at the time of assessment.

Assessment must occur in workplace operational situations or, where this is not available, in simulated workplace operational situations that replicate tram workplace conditions.

Assessment processes and techniques must be appropriate to the language, literacy and numeracy requirements of the work being performed and the needs of the candidate.

Resources for assessment include:

a range of relevant exercises, case studies and/or simulations

relevant and appropriate materials, tools, equipment and personal protective equipment currently used in industry

applicable documentation including workplace procedures, regulations, codes of practice and operation manuals.

Prerequisites/co-requisites
Competency Field C – Vehicle Operation
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Determine berthing location
       
Element: Contact is made with tram controller and depot staff, or information is obtained from an information board, to determine planned location for berthing tram
       
Element: Directions of tram controller and depot staff are interpreted and followed
       
Element: Berth and shut down an electric tram
       
Element: Hazards are identified, risks are assessed and risk control measures are implemented
       
Element: Electric tram is berthed in accordance with organisational and site requirements
       
Element: Shutdown procedures are carried out in accordance with specifications and organisational requirements
       
Element: Carry out postoperational checks
       
Element: Visual and other checks are made of tram in accordance with workplace procedures
       
Element: Identified faults and defects are fixed or reported and recorded in accordance with workplace procedures
       
Element: Faulty and defective equipment that presents a safety risk is reported in accordance with workplace procedures and relevant regulations
       
Element: Outcomes of postoperational checks are recorded in accordance with workplace procedures
       
Element: Secure an electric tram
       
Element: Brakes are applied in accordance with workplace procedures
       
Element: Electric tram is secured in accordance with depot requirements
       
Element: Complete postoperational paperwork
       
Element: Timesheet or other work record is completed
       
Element: Roster is checked for future work allocation
       
Element: Issues and variations are discussed and resolved with roster clerk
       
Element: All required documentation is completed in accordance with workplace procedures
       
Element: All equipment is returned and stowed in accordance with workplace requirements
       
Element: Electric tram records are completed in accordance with workplace procedures and regulatory requirements
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Determine berthing location

1.1

Contact is made with tram controller and depot staff, or information is obtained from an information board, to determine planned location for berthing tram

1.2

Directions of tram controller and depot staff are interpreted and followed

2

Berth and shut down an electric tram

2.1

Hazards are identified, risks are assessed and risk control measures are implemented

2.2

Electric tram is berthed in accordance with organisational and site requirements

2.3

Shutdown procedures are carried out in accordance with specifications and organisational requirements

3

Carry out postoperational checks

3.1

Visual and other checks are made of tram in accordance with workplace procedures

3.2

Identified faults and defects are fixed or reported and recorded in accordance with workplace procedures

3.3

Faulty and defective equipment that presents a safety risk is reported in accordance with workplace procedures and relevant regulations

3.4

Outcomes of postoperational checks are recorded in accordance with workplace procedures

4

Secure an electric tram

4.1

Brakes are applied in accordance with workplace procedures

4.2

Electric tram is secured in accordance with depot requirements

5

Complete postoperational paperwork

5.1

Timesheet or other work record is completed

5.2

Roster is checked for future work allocation

5.3

Issues and variations are discussed and resolved with roster clerk

5.4

All required documentation is completed in accordance with workplace procedures

5.5

All equipment is returned and stowed in accordance with workplace requirements

5.6

Electric tram records are completed in accordance with workplace procedures and regulatory requirements

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least one occasion and include:

adapting to differences in trams and associated equipment and procedures

communicating effectively with others

conducting a visual inspection of an electric tram

identifying job hazards and taking required action to minimise, control or eliminate identified hazards

implementing contingency plans

interpreting and following operational instructions and prioritising work

modifying activities depending on operational contingencies, risk situations and environments

reading and interpreting relevant instructions, procedures and information

recognising problems that may arise and taking appropriate action

shutting down an electric tram after service

working collaboratively with others.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

applicable state/territory legislated rail safety requirements, relevant codes of practice and/or guidelines

braking and safety system procedures

electric tram controls, instruments and indicators and their purpose, location and use

emergency procedures

monitoring devices; braking and power equipment; safety systems, ancillary systems; and signalling systems

operating controls to start, accelerate, decelerate and stop an electric tram

procedure for completing relevant documentation when berthing and shutting down an electric tram

procedures and required protocol for operating electronic communications equipment

procedures for identifying equipment defects and assessing for appropriate action

procedures for managing hazardous situations

procedures for operating and shutting down ancillary systems

procedures for operating, berthing and shutting down an electric tram

relevant state/territory road and traffic authority and tramway operating procedures

relevant work health and safety (WHS)/occupational health and safety (OHS) and environmental procedures and regulations

speed and load limit compliance requirements

typical defects that can occur on an electric tram and related action that should be taken.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

ELEMENTS

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Determine berthing location

1.1

Contact is made with tram controller and depot staff, or information is obtained from an information board, to determine planned location for berthing tram

1.2

Directions of tram controller and depot staff are interpreted and followed

2

Berth and shut down an electric tram

2.1

Hazards are identified, risks are assessed and risk control measures are implemented

2.2

Electric tram is berthed in accordance with organisational and site requirements

2.3

Shutdown procedures are carried out in accordance with specifications and organisational requirements

3

Carry out postoperational checks

3.1

Visual and other checks are made of tram in accordance with workplace procedures

3.2

Identified faults and defects are fixed or reported and recorded in accordance with workplace procedures

3.3

Faulty and defective equipment that presents a safety risk is reported in accordance with workplace procedures and relevant regulations

3.4

Outcomes of postoperational checks are recorded in accordance with workplace procedures

4

Secure an electric tram

4.1

Brakes are applied in accordance with workplace procedures

4.2

Electric tram is secured in accordance with depot requirements

5

Complete postoperational paperwork

5.1

Timesheet or other work record is completed

5.2

Roster is checked for future work allocation

5.3

Issues and variations are discussed and resolved with roster clerk

5.4

All required documentation is completed in accordance with workplace procedures

5.5

All equipment is returned and stowed in accordance with workplace requirements

5.6

Electric tram records are completed in accordance with workplace procedures and regulatory requirements

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions can be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Forms

Assessment Cover Sheet

TLIC3034 - Berth and shut down an electric tram
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

TLIC3034 - Berth and shut down an electric tram

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: