Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

TLIC3052A Mapping and Delivery Guide
Assist with shunting, coupling and uncoupling electric passenger trains

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency TLIC3052A - Assist with shunting, coupling and uncoupling electric passenger trains
Description This unit involves the skills and knowledge required to assist a train driver to shunt, couple and uncouple an electric passenger train to operational requirements in accordance with safeworking and regulatory requirements and workplace procedures. This includes assisting with planning and preparing for shunting operations, shunting the train, coupling and uncoupling the train, and using a coupling adaptor. Licensing or certification requirements are not applicable to this unit.
Employability Skills This unit contains employability skills.
Learning Outcomes and Application Persons achieving competence in this unit will need to fulfil the applicable legislated rail safety requirements including state and territory acts and regulations together with any nationally approved compliance codes and/or guidelines.Work is performed with minimal supervision, generally within a team environment. It involves the application of routine operational principles and procedures to shunting, coupling and uncoupling electric passenger trains to operational requirements as part of workplace activities across a variety of operational contexts within the Australian rail system.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites Not Applicable
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Plan and prepare for shunting operation
  • Shunting requirements are confirmed through workplace documents and/or relevant personnel
  • Local safety requirements are identified and performed according to workplace procedures
  • Relevant OH&S requirements are followed to prevent injury and damage
       
Element: Assist with shunting of trains
  • Where required, points, levers, and/or switches are operated in accordance with workplace requirements
  • Audible signals, hand signals and other line of sight communications are used to assist the control of train movements
  • Hand, light and radio shunting commands used are responded to in accordance with workplace requirements
  • Pre-movement inspection/tests are carried out prior to moving trains
       
Element: Assist with coupling of trains
  • Type of connections required are identified prior to coupling
  • When trains to be coupled are positioned according to operating procedures and workplace requirements, ensure couplers are aligned and in the appropriate position for type of connection required
  • Ensure all safety requirements are met prior to coupling trains
  • After trains are coupled, post-coupling inspection/tests are carried out according to operating procedures and workplace requirements
       
Element: Assist with uncoupling of trains
  • Train to be uncoupled is identified and checks are made to ensure all safety requirements are met prior to uncoupling
  • Train is uncoupled according to operating procedures and workplace requirements
  • Post-uncoupling inspection/tests are carried out according to operating procedures and workplace requirements
       
Element: Use coupling adaptor
  • Situations requiring the use of a coupling adaptor are identified as per workplace procedures
  • Coupling adaptor is accessed and transported to required location for use
  • Ensure all safety requirements are met prior to fitting coupling adaptor
  • Coupling adaptor is attached to one of the trains prior to coupling according to workplace procedures
  • Trains are coupled in accordance with workplace procedures and coupling adaptor is secured in place
  • Post-coupling inspection/tests and/or procedures are carried out according to operating procedures and workplace requirements
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required knowledge and skills, the range statement and the assessment guidelines for this Training Package.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria of this unit and include demonstration of applying:

the underpinning knowledge and skills

relevant legislation and workplace procedures

other relevant aspects of the range statement

Assessment must include exercises which demonstrate competent performance of the following in a range of situations:

carrying out pre-shunting checks correctly

assisting appropriately with the shunting of trains in a number of locations including sidings and depots/yards

assisting with coupling activities, including using coupling adaptor correctly

Context of and specific resources for assessment

Performance is demonstrated consistently over a period of time and in a suitable range of contexts

Resources for assessment include:

a range of relevant exercises, case studies and/or other simulated practical and knowledge assessment, and/or

access to an appropriate range of relevant operational situations in the workplace

In both real and simulated environments, access is required to:

relevant and appropriate materials and equipment, and

applicable documentation including workplace procedures, regulations, codes of practice and operation manuals

Method of assessment

Assessment of this unit must be undertaken by a registered training organisation

As a minimum, assessment of knowledge must be conducted through appropriate written/oral tests

Practical assessment must occur:

through activities in an appropriately simulated environment, and/or

in an appropriate range of situations in the workplace


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

REQUIRED KNOWLEDGE AND SKILLS

This describes the essential knowledge and skills and their level required for this unit.

Required knowledge:

Legislated rail safety requirements including acts and regulations from the applicable state together with any nationally approved compliance codes and/or guidelines

Relevant OH&S and environmental procedures and regulations including codes of practice for manual handling

Shunting procedures and requirements

Coupling systems, their components and their operation

Types of couplers and their purpose

Types of coupling adaptors and their purpose

Diagnostic techniques relating to shunting, coupling and uncoupling electric passenger trains

Communication protocols

Procedures to be followed in the event of an emergency

Required skills:

Communicate effectively with others when shunting, coupling and uncoupling electric passenger trains

Read and interpret instructions, procedures, information and signs relevant to shunting, coupling and uncoupling electric passenger trains

Interpret and follow operational instructions and prioritise work

Operate electronic communication equipment to required protocol

Work collaboratively with others when shunting, coupling and uncoupling electric passenger trains

Identify and assess electric passenger train defects and deficiencies and take appropriate action to report, isolate, repair or replace any identified defective equipment as per workplace procedures

Promptly report and/or rectify any identified problems, faults or malfunctions when shunting, coupling and uncoupling electric passenger trains in accordance with regulatory requirements and workplace procedures

Apply rail safety practices and regulations

Implement contingency plans for unplanned events

Apply precautions and required action to minimise, control or eliminate hazards that may exist during work activities

Monitor work activities in terms of planned schedule

Modify activities depending on differing operational contingencies, risk situations and environments

Work systematically with required attention to detail without injury to self or others, or damage to goods or equipment

Assess shunting, coupling and uncoupling defects

Operate and adapt to differences in trains and related equipment in accordance with standard operating procedures

Select and use required personal protective equipment conforming to industry and OH&S standards

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance.

Operations may be conducted:

by day or night

in all weather conditions

Equipment may include:

electric passenger train

transition coupler

emergency coupler

coupling adaptor

OH&S requirements may include the use of:

gloves

sunscreen, sunglasses and safety glasses

insect repellent

safety footwear

portable radios

hand lamps

flags

high visibility clothing

emergency warning devices

portable signs and markers

Contingencies may include:

derailments

collisions

breakdowns

injuries and fatalities

fires

track damage

powerline damage

broken/missing equipment

Contingency plans and contingencies may involve:

emergency procedures manuals

safeworking systems and requirements

Depending on the type of organisation concerned and the local terminology used, workplace procedures may include:

company procedures

enterprise procedures

organisational procedures

established procedures

Information/documents may include:

noticeboards

special train notices

periodical circulars

rules and operating procedures

computer-based data systems

timetables

train consist

incident reports

train register book

emergency procedures manual

conditions of service, legislation and industrial agreements including workplace agreements and awards

Applicable regulations, legislation and codes may include:

relevant state/territory codes of practice and safeworking system requirements

relevant state/territory OH&S legislation

relevant state/territory fatigue management regulations

relevant state/territory environmental protection legislation

relevant Australian Standards

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Shunting requirements are confirmed through workplace documents and/or relevant personnel 
Local safety requirements are identified and performed according to workplace procedures 
Relevant OH&S requirements are followed to prevent injury and damage 
Where required, points, levers, and/or switches are operated in accordance with workplace requirements 
Audible signals, hand signals and other line of sight communications are used to assist the control of train movements 
Hand, light and radio shunting commands used are responded to in accordance with workplace requirements 
Pre-movement inspection/tests are carried out prior to moving trains 
Type of connections required are identified prior to coupling 
When trains to be coupled are positioned according to operating procedures and workplace requirements, ensure couplers are aligned and in the appropriate position for type of connection required 
Ensure all safety requirements are met prior to coupling trains 
After trains are coupled, post-coupling inspection/tests are carried out according to operating procedures and workplace requirements 
Train to be uncoupled is identified and checks are made to ensure all safety requirements are met prior to uncoupling 
Train is uncoupled according to operating procedures and workplace requirements 
Post-uncoupling inspection/tests are carried out according to operating procedures and workplace requirements 
Situations requiring the use of a coupling adaptor are identified as per workplace procedures 
Coupling adaptor is accessed and transported to required location for use 
Ensure all safety requirements are met prior to fitting coupling adaptor 
Coupling adaptor is attached to one of the trains prior to coupling according to workplace procedures 
Trains are coupled in accordance with workplace procedures and coupling adaptor is secured in place 
Post-coupling inspection/tests and/or procedures are carried out according to operating procedures and workplace requirements 

Forms

Assessment Cover Sheet

TLIC3052A - Assist with shunting, coupling and uncoupling electric passenger trains
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

TLIC3052A - Assist with shunting, coupling and uncoupling electric passenger trains

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: