Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
TLID0041 Mapping and Delivery Guide
Plan and conduct specialised lift
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | TLID0041 - Plan and conduct specialised lift |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Necessary parameters are measured to ensure accuracy of calculations | ||||||||
Element: Operation plan requirements, safe work method statements and other work specifications are interpreted and clarification is sought as required from relevant personnel | ||||||||
Element: Additional information about load and possible hazards is sought from customer and technical personnel, as required | ||||||||
Element: Special site requirements are identified |
| |||||||
Element: Approval to carry out lift is obtained from appropriate statutory authority, as required | ||||||||
Element: Multiple crane lifts are planned, as required, to encompass determination of types of cranes suitable for use and an assessment of load share to be carried by each crane | ||||||||
Element: Crane load chart is interpreted and information on permissible loads, radii, weights, boom and jib are taken into account in planning lift | ||||||||
Element: Rated capacity and/or working load limit (WLL) is calculated | ||||||||
Element: Appropriate drawings and simulations are reviewed to check feasibility of planned operations | ||||||||
Element: Information from previous lifts is used in developing operational plan | ||||||||
Element: Need for additional and/or specialised equipment is obtained in accordance with workplace procedures |
| |||||||
Element: Operating and emergency controls are checked to ensure crane is in safe working order | ||||||||
Element: Appropriate personal protective equipment (PPE) is selected and worn in accordance with manufacturer specifications, workplace procedures and site requirements | ||||||||
Element: Site is isolated in accordance with operation plan and assistance is sought to ensure public safety, as required | ||||||||
Element: Other personnel on site are directed, as required to ensure risks to personnel and equipment are minimised | ||||||||
Element: Work effectively in a team |
| |||||||
Element: Ideas are discussed and evaluated with team members to determine viability and to reach consensus on an effective plan | ||||||||
Element: Individual roles and responsibilities are clarified and agreed | ||||||||
Element: Other team members are assisted, as required, to ensure operation can be completed safety and efficiently |
| |||||||
Element: Test runs are conducted, as required, to ensure a safe lift in accordance with operation plan | ||||||||
Element: Load is hoisted using crane movements in accordance with the appropriate Australian Standards and operation plan | ||||||||
Element: Lift is monitored and instruction to stop operation is given when there are concerns lift is not proceeding as planned | ||||||||
Element: Potential impact of change in one area of operation on lift as a whole is recognised | ||||||||
Element: Contribution is made to developing alternative operational plan | ||||||||
Element: Load is placed into position in accordance with the appropriate Australian Standards and operation plan, or if required, alternative operational plan |
| |||||||
Element: Operation is reviewed in consultation with relevant personnel and contribution is made to recommendations for review of procedures, as required | ||||||||
Element: Need for further after job debriefing is recognised and appropriate action is taken | ||||||||
Element: Records are completed promptly in accordance with workplace procedures |