Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
TLIS2020 Mapping and Delivery Guide
Install overhead wiring structure
Version 1.0
Issue Date: April 2024
Qualification | - |
Unit of Competency | TLIS2020 - Install overhead wiring structure | |
---|---|---|---|---|
Description | ||||
Employability Skills | ||||
Learning Outcomes and Application | This unit involves the skills and knowledge required to install overhead wiring structures in accordance with safeworking and regulatory requirements, and workplace procedures.It includes planning and preparing for installation, installing the required components to specification and completing all required documentation.People achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice and/or guidelines.Work is performed under minimal supervision, generally within a team environment.Operators of mechanised equipment must have undertaken training and, where appropriate, hold the relevant licence, permit or certificate and be recognised as competent for the class of machinery being used.No licensing, legislative or certification requirements apply to this unit at the time of publication. | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
|
|||
Prerequisites/co-requisites | ||||
Competency Field | S ‒ Construction and Installation |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan installation | ||||||||
Element: Work requirements are determined to identify scope of work and resources required | ||||||||
Element: Hazards are identified, risks are assessed and control measures are implemented | ||||||||
Element: Type of overhead wiring structure required for job is identified and organised | ||||||||
Element: Prepare for installation | ||||||||
Element: Footings are prepared and excavated in accordance with rail industry standards and workplace procedures | ||||||||
Element: Formwork is installed in accordance with rail industry standards and workplace procedures | ||||||||
Element: Concrete reinforcing is installed in accordance with rail industry standards and workplace procedures | ||||||||
Element: Concrete is mixed and placed in accordance with rail industry standards and workplace procedures | ||||||||
Element: Hold down plates/bolts are placed into concrete to correct dimensions to enable fitting of overhead wiring structure | ||||||||
Element: Install components | ||||||||
Element: Components are assembled onto bridge section as required in preparation for installation | ||||||||
Element: Masts and other components are positioned and installed as required in accordance with accepted workplace procedures | ||||||||
Element: Fastening systems are installed in accordance with rail industry standards to ensure the integrity of the overhead wiring structure | ||||||||
Element: Complete documentation | ||||||||
Element: Required documentation procedures and processes are confirmed | ||||||||
Element: Documentation is filled in legibly and proofread | ||||||||
Element: Documentation is processed in accordance with workplace procedures |