Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
TLIS2028 Mapping and Delivery Guide
Install and replace transoms
Version 1.0
Issue Date: April 2024
Qualification | - |
Unit of Competency | TLIS2028 - Install and replace transoms | |
---|---|---|---|---|
Description | ||||
Employability Skills | ||||
Learning Outcomes and Application | This unit involves the skills and knowledge required to install and replace transoms on underbridges in accordance with safeworking and regulatory requirements, and workplace procedures.It includes preparing for work, installing/replacing transoms and completing documentation.People achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice and/or guidelines.Work is performed under minimal supervision, generally within a team environment.It involves the application of routine operational principles and procedures when installing or replacing transoms, as part of workplace activities across a variety of operational contexts within the Australian rail system.No licensing, legislative or certification requirements apply to this unit at the time of publication. | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
|
|||
Prerequisites/co-requisites | ||||
Competency Field | S ‒ Construction and Installation |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare for work | ||||||||
Element: Worksite is identified | ||||||||
Element: Hazards are identified, risks are assessed and control measures are implemented | ||||||||
Element: Installation, replacement or repair method is selected to meet work requirements in accordance with workplace procedures | ||||||||
Element: Plant, equipment and other materials are prepared for work | ||||||||
Element: Transoms are prepared in accordance with job requirements using correct methods, including dressing and protective coatings | ||||||||
Element: Install or replace transoms | ||||||||
Element: Unserviceable transoms are extracted as required, using manual or mechanical methods in accordance with workplace procedures | ||||||||
Element: New transom is installed using manual or mechanical methods in accordance with workplace standards and procedures | ||||||||
Element: Transom is suitably supported by appropriate methods in accordance with workplace standards and procedures | ||||||||
Element: Transom bolts are replaced or tightened as required | ||||||||
Element: Work is completed to meet track geometry requirements in accordance with workplace standards and procedures | ||||||||
Element: Work is checked for compliance with acceptance standards for spacing, skew and geometry | ||||||||
Element: Complete documentation | ||||||||
Element: Required documentation procedures and processes are confirmed | ||||||||
Element: Documentation is filled in legibly and proofread | ||||||||
Element: Documentation is processed in accordance with workplace procedures |