TLIS3041 Mapping and Delivery Guide
Construct timber or composite points and crossings
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | TLIS3041 - Construct timber or composite points and crossings | |
---|---|---|---|---|
Description | ||||
Employability Skills | ||||
Learning Outcomes and Application | This unit involves the skills and knowledge required to construct points and crossings on timber or composite bearers in accordance with rail industry standards, safeworking and regulatory requirements, and workplace procedures. It includes preparing for construction work, carrying out relevant construction work, preparing points and crossings for transport, and completing required documentation. People achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice and/or guidelines.The unit involves the application of routine operational principles and procedures when constructing points and crossings on undrilled timber or composite bearers, as part of workplace activities across a variety of operational contexts within the Australian rail system.No licensing, legislative or certification requirements apply to this unit at the time of publication. | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
|
|||
Prerequisites/co-requisites | ||||
Competency Field | S – Construction and Installation |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare points and crossings | ||||||||
Element: Work requirements are established to identify scope of work and resources required | ||||||||
Element: Construction design or plan is obtained and interpreted | ||||||||
Element: Hazards are identified, risks are assessed and control measures are implemented | ||||||||
Element: Required resources are acquired | ||||||||
Element: Assembly area is prepared or identified in accordance with workplace procedures | ||||||||
Element: Delivered materials are checked for compliance with design | ||||||||
Element: Fabricate points and crossings | ||||||||
Element: Structure is fabricated according to design specification | ||||||||
Element: Bearers are selected for correct length, placed on assembly area and marked up, in accordance with specified design and workplace procedures | ||||||||
Element: Reference rail is selected, marked up and fixed to bearers, in accordance with specified design and workplace procedures | ||||||||
Element: Remaining steelwork is adjusted for correct geometry and is attached to bearers, in accordance with specified design and workplace procedure | ||||||||
Element: Dimensions, geometry and condition are checked for compliance with design | ||||||||
Element: Non compliances are repaired or replaced as required in accordance with workplace procedures | ||||||||
Element: Prepare points and crossings for transport | ||||||||
Element: Transport requirements are confirmed | ||||||||
Element: Transport requirements are followed in accordance with manufacturer instructions and workplace procedures | ||||||||
Element: Documentation is completed and processed in accordance with workplace procedures |