TLIS3045 Mapping and Delivery Guide
Install turnouts
Version 1.0
Issue Date: April 2024
Qualification | - |
Unit of Competency | TLIS3045 - Install turnouts | |
---|---|---|---|---|
Description | ||||
Employability Skills | ||||
Learning Outcomes and Application | This unit involves the skills and knowledge required to install turnouts in accordance with rail industry standards, safeworking and regulatory requirements, and workplace procedures.It includes installing points and crossings, and completing required documentation.People achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice and/or guidelines.The unit involves the application of routine operational principles and procedures when installing points and crossings, as part of workplace activities across a variety of operational contexts within the Australian rail system.No licensing, legislative or certification requirements apply to this unit at the time of publication. | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
|
|||
Prerequisites/co-requisites | ||||
Competency Field | S – Construction and Installation |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to install turnouts | ||||||||
Element: Hazards are identified, risks are assessed and control measures are implemented | ||||||||
Element: Existing track work is removed from worksite | ||||||||
Element: Track bed is prepared for installation of points and crossings in accordance with workplace procedures | ||||||||
Element: Install turnouts | ||||||||
Element: New points and crossings are installed in accordance with specified design, manufacturer instructions and workplace procedures | ||||||||
Element: Dimensions, geometry, condition and operation are checked for compliance with rail industry standards in accordance with design, manufacturer instructions and workplace procedures | ||||||||
Element: Non compliances are repaired or replaced as required in accordance with workplace procedures | ||||||||
Element: Complete installation process | ||||||||
Element: Documentation is filled in legibly and proofread | ||||||||
Element: Documentation is completed in accordance with organisational procedures | ||||||||
Element: Appropriate personnel are informed that the installation has been completed, in accordance with organisational procedures |