ELEMENTS | PERFORMANCE CRITERIA |
Elements describe the essential outcomes. | Performance criteria describe the performance needed to demonstrate achievement of the element. |
1 | Prepare computer programmed machinery to dock boards | 1.1 | Appropriate work health and safety (WHS)/occupational health and safety (OHS) and other regulatory procedures are followed |
1.2 | Hazards are identified, risks are assessed and control measures are implemented |
1.3 | Job requirements regarding sizes and lengths are obtained from standards |
1.4 | Start-up checks are completed in accordance with workplace procedures |
1.5 | General cross-section, length and condition of boards on conveyor are visually assessed in accordance with workplace quality standards |
1.6 | Program to cut requirements is selected from a range of available programs |
1.7 | Program is loaded and machine cycle is checked |
1.8 | Need for new programs is identified and reported to supervisor |
1.9 | Communication with supervisor and other workers is maintained to ensure efficient workflow |
2 | Operate programmed machinery to dock boards | 2.1 | Trial boards are cut to check process and output |
2.2 | Machinery is operated to dock timber to specification |
2.3 | Reject boards are identified and directed for disposal or recovery |
2.4 | Faults/problems with materials or componentry are identified and appropriate action is taken in accordance with workplace procedures |
3 | Monitor and rectify processing operations as required | 3.1 | Dimensions and finish of cut boards are regularly checked in accordance with workplace standard procedures |
3.2 | Sawing process is adjusted to maintain accurate sizing |
3.3 | Feed systems are regularly monitored for material flow problems |
3.4 | Minor feed problems are cleared in accordance with equipment manufacturer instructions |
3.5 | Characteristics of blunt and damaged saws are recognised and appropriate action is taken to rectify identified problem/s in accordance with workplace procedures |
3.6 | Saw blades are removed and replaced in accordance with workplace procedures |
3.7 | Work area is regularly cleaned in accordance with workplace procedures |
4 | Complete operations | 4.1 | Machine shut down is conducted in accordance with workplace and manufacturer guidelines |
4.2 | Boards are relocated to holding area without damage to boards, personnel or equipment |
4.3 | Waste materials are directed for disposal or recovery |
4.4 | Production records are completed in accordance with workplace procedures |
4.5 | Maintenance program is completed as required and recorded in accordance with workplace procedures |