Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

TLIW2038 Mapping and Delivery Guide
Place and remove temporary speed restriction equipment

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency TLIW2038 - Place and remove temporary speed restriction equipment
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to place and remove temporary speed restriction (TSR) equipment in accordance with legislative and regulatory requirements.This unit involves applying the network owner’s policies, procedures and protocols when placing and removing TSR equipment in the rail corridor.People achieving competence in this unit will need to fulfil the applicable state/territory legislated rail safety requirements and to comply with relevant codes of practice and/or guidelines.Activities are performed using established safeworking procedures, with duty of care accountability and responsibility for self and others in achieving the prescribed outcomes within the limits of own responsibility.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

As a minimum, assessors must satisfy applicable regulatory requirements, which include requirements in the Standards for Registered Training Organisations current at the time of assessment.

As a minimum, assessment must satisfy applicable regulatory requirements, which include requirements in the Standards for Registered Training Organisations current at the time of assessment.

Assessment must occur in workplace operational situations or, where this is not available, in simulated workplace operational situations that replicate rail corridor workplace conditions.

Assessment processes and techniques must be appropriate to the language, literacy and numeracy requirements of the work being performed and the needs of the candidate.

Resources for assessment include:

a range of relevant exercises, case studies and/or simulations

relevant and appropriate materials, tools, equipment and personal protective equipment currently used in industry

applicable documentation and terminology as defined by the relevant Rail Infrastructure Manager safeworking system including workplace procedures, regulations, rail industry standards, rules and codes of practice.

Prerequisites/co-requisites
Competency Field W – Equipment and Systems Operations
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Place temporary speed restriction equipment
       
Element: Location, type and required speed of restriction to be placed is confirmed
       
Element: Hazards are identified, risks are assessed and control measures are implemented
       
Element: Relevant Network Control Officer is contacted and informed, in accordance with network owner’s policies and procedures
       
Element: Equipment is checked for availability and suitability to perform job in accordance with network owner’s policies and procedures
       
Element: TSR equipment is placed in accordance with network owner’s standards
       
Element: Relevant personnel are notified that TSR equipment has been placed
       
Element: Remove temporary speed restriction equipment
       
Element: Location, type and speed of restriction to be removed is confirmed
       
Element: Relevant Network Control Officer is contacted and informed as required, in accordance with network owner’s policies and procedures
       
Element: Equipment is removed from track, and secured and stowed appropriately
       
Element: Relevant personnel are notified that TSR equipment has been removed
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Place temporary speed restriction equipment

1.1

Location, type and required speed of restriction to be placed is confirmed

1.2

Hazards are identified, risks are assessed and control measures are implemented

1.3

Relevant Network Control Officer is contacted and informed, in accordance with network owner’s policies and procedures

1.4

Equipment is checked for availability and suitability to perform job in accordance with network owner’s policies and procedures

1.5

TSR equipment is placed in accordance with network owner’s standards

1.6

Relevant personnel are notified that TSR equipment has been placed

2

Remove temporary speed restriction equipment

2.1

Location, type and speed of restriction to be removed is confirmed

2.2

Hazards are identified, risks are assessed and control measures are implemented

2.3

Relevant Network Control Officer is contacted and informed as required, in accordance with network owner’s policies and procedures

2.4

Equipment is removed from track, and secured and stowed appropriately

2.5

Relevant personnel are notified that TSR equipment has been removed

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least one occasion and include:

applying relevant safeworking system and workplace procedures in a suitable rail corridor context

communicating effectively with individuals and groups

identifying job hazards and taking required action to minimise, control or eliminate identified hazards

reading and interpreting Rail Infrastructure Manager procedures for placing and removing temporary speed restriction (TSR) equipment

using TSR equipment in accordance with required Rail Infrastructure Manager standards

working within the available timeframes for the work function and in accordance with workplace safeworking procedures.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

Rail Infrastructure Manager workplace procedures for placing and removing TSR equipment

relevant rail danger zones

terminology as defined by the relevant Rail Infrastructure Manager safeworking system.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Place temporary speed restriction equipment

1.1

Location, type and required speed of restriction to be placed is confirmed

1.2

Hazards are identified, risks are assessed and control measures are implemented

1.3

Relevant Network Control Officer is contacted and informed, in accordance with network owner’s policies and procedures

1.4

Equipment is checked for availability and suitability to perform job in accordance with network owner’s policies and procedures

1.5

TSR equipment is placed in accordance with network owner’s standards

1.6

Relevant personnel are notified that TSR equipment has been placed

2

Remove temporary speed restriction equipment

2.1

Location, type and speed of restriction to be removed is confirmed

2.2

Hazards are identified, risks are assessed and control measures are implemented

2.3

Relevant Network Control Officer is contacted and informed as required, in accordance with network owner’s policies and procedures

2.4

Equipment is removed from track, and secured and stowed appropriately

2.5

Relevant personnel are notified that TSR equipment has been removed

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions can be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
 
 
 
 
 
 
 
 
 
 
 
 

Forms

Assessment Cover Sheet

TLIW2038 - Place and remove temporary speed restriction equipment
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

TLIW2038 - Place and remove temporary speed restriction equipment

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: