Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

TLIW5001 Mapping and Delivery Guide
Apply rail communications systems

Version 1.0
Issue Date: April 2024


Qualification -
Unit of Competency TLIW5001 - Apply rail communications systems
Description
Employability Skills
Learning Outcomes and Application This unit involves applying rail communications systems, in accordance with workplace procedures and regulatory requirements.It includes preparing to apply rail communications systems, recording and logging communications, and ensuring safeworking systems are incorporated into communications systems. No licensing, legislative or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

As a minimum, assessors must satisfy applicable regulatory requirements, which include requirements in the Standards for Registered Training Organisations current at the time of assessment.

As a minimum, assessment must satisfy applicable regulatory requirements, which include requirements in the Standards for Registered Training Organisations current at the time of assessment.

Assessment must occur in rail workplace operational situations or, where this is not available, in simulated workplace operational situations that replicate rail workplace conditions.

Assessment processes and techniques must be appropriate to the language, literacy and numeracy requirements of the work being performed and the needs of the candidate.

Resources for assessment include:

a range of relevant exercises, case studies and/or simulations

relevant and appropriate materials, tools, equipment and personal protective equipment currently used in industry

applicable documentation including workplace procedures, regulations, rail industry standards, codes of practice and operation manuals.

Prerequisites/co-requisites
Competency Field W – Equipment and Systems Operations
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to apply rail communications systems
       
Element: Communications systems used in the rail industry are outlined
       
Element: Main components of fixed and mobile communications systems are identified and explained
       
Element: Functions of the different types of communications systems used in the rail industry are explained
       
Element: Effectiveness of different types of communications systems are compared
       
Element: Communications system/s appropriate to a situation are selected in accordance with organisational policies and procedures
       
Element: Hazards are identified, risks are assessed and control measures are implemented
       
Element: Working order of selected communications system/s is ensured in accordance with organisational policies and procedures
       
Element: Record and log communications
       
Element: Purpose of recording and logging communications is identified
       
Element: Methods by which communications are recorded and logged are identified and explained
       
Element: Effectiveness of different types of communications recording and logging processes are outlined
       
Element: Communications recording and logging processes most appropriate to a situation are selected in accordance with organisational policies and procedure
       
Element: Relevant communications systems plans are identified, explained and implemented in accordance with organisational policies and procedures
       
Element: Ensure safeworking systems are incorporated into communications systems
       
Element: Different methods of safeworking are identified and communications used for each type are outlined
       
Element: Potential problems that can occur with different communications systems are identified and explained
       
Element: Methods to overcome identified problems are developed and implemented
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare to apply rail communications systems

1.1

Communications systems used in the rail industry are outlined

1.2

Main components of fixed and mobile communications systems are identified and explained

1.3

Functions of the different types of communications systems used in the rail industry are explained

1.4

Effectiveness of different types of communications systems are compared

1.5

Communications system/s appropriate to a situation are selected in accordance with organisational policies and procedures

1.6

Hazards are identified, risks are assessed and control measures are implemented

1.7

Working order of selected communications system/s is ensured in accordance with organisational policies and procedures

2

Record and log communications

2.1

Purpose of recording and logging communications is identified

2.2

Methods by which communications are recorded and logged are identified and explained

2.3

Effectiveness of different types of communications recording and logging processes are outlined

2.4

Communications recording and logging processes most appropriate to a situation are selected in accordance with organisational policies and procedure

2.5

Relevant communications systems plans are identified, explained and implemented in accordance with organisational policies and procedures

3

Ensure safeworking systems are incorporated into communications systems

3.1

Different methods of safeworking are identified and communications used for each type are outlined

3.2

Potential problems that can occur with different communications systems are identified and explained

3.3

Methods to overcome identified problems are developed and implemented

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least one occasion and include:

accessing and using rail industry standards and safety management systems (SMSs)

applying relevant safeworking and workplace procedures

communicating effectively with others and interpreting complex information related to rail operations

ensuring safeworking systems are incorporated into communications systems

identifying job hazards and taking required action to minimise, control or eliminate identified hazards

preparing to apply rail communications systems

recording and logging communications

researching relevant information

reviewing regulatory information changes.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

emergency management plan

key concepts and definitions relating to rail communications systems

key principles and practices associated with railway operations

key rail industry regulatory requirements and standards

rail industry terminology, including terminology used in rail industry standards and codes of practice

rail regulatory framework

rail SMSs

relevance of national and international standards to the rail industry.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1

Prepare to apply rail communications systems

1.1

Communications systems used in the rail industry are outlined

1.2

Main components of fixed and mobile communications systems are identified and explained

1.3

Functions of the different types of communications systems used in the rail industry are explained

1.4

Effectiveness of different types of communications systems are compared

1.5

Communications system/s appropriate to a situation are selected in accordance with organisational policies and procedures

1.6

Hazards are identified, risks are assessed and control measures are implemented

1.7

Working order of selected communications system/s is ensured in accordance with organisational policies and procedures

2

Record and log communications

2.1

Purpose of recording and logging communications is identified

2.2

Methods by which communications are recorded and logged are identified and explained

2.3

Effectiveness of different types of communications recording and logging processes are outlined

2.4

Communications recording and logging processes most appropriate to a situation are selected in accordance with organisational policies and procedure

2.5

Relevant communications systems plans are identified, explained and implemented in accordance with organisational policies and procedures

3

Ensure safeworking systems are incorporated into communications systems

3.1

Different methods of safeworking are identified and communications used for each type are outlined

3.2

Potential problems that can occur with different communications systems are identified and explained

3.3

Methods to overcome identified problems are developed and implemented

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions can be found in the Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Forms

Assessment Cover Sheet

TLIW5001 - Apply rail communications systems
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

TLIW5001 - Apply rail communications systems

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: