Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEEAS0007 Mapping and Delivery Guide
Assemble, mount and connect control gear and switchgear
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEEAS0007 - Assemble, mount and connect control gear and switchgear | |
---|---|---|---|---|
Description | ||||
Employability Skills | ||||
Learning Outcomes and Application | This unit involves the skills and knowledge required to assemble, mount and connect control gear and switchgear, including the interconnections within a switchboard enclosure intended to operate at voltages up to 1,000 volts (V) alternating current (a.c.) or 1,500 V direct current (d.c.). It includes working safely; following standards, specifications and component manufacturer requirements; matching equipment with that specified; terminating cables; connecting wiring and completing necessary documentation.No licensing, legislative or certification requirements apply to this unit at the time of publication. | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
|
|||
Prerequisites/co-requisites | ||||
Competency Field | Assembly |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan to assemble, mount and connect control gear and switchgear |
| |||||||
Element: Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified and applied | ||||||||
Element: Work instructions, including layout and wiring diagrams, are applied in accordance with workplace procedures | ||||||||
Element: Advice is sought from supervisor to ensure work is coordinated effectively with relevant person/s | ||||||||
Element: Materials required for the control gear and switchgear installation work are obtained in accordance with workplace procedures | ||||||||
Element: Tools, equipment and measuring devices required to carry out work are obtained and checked for correct operation and safety | ||||||||
Element: Assemble, mount and connect control gear and switchgear |
| |||||||
Element: Circuits are checked and isolated in accordance with WHS/OHS workplace requirements and procedures | ||||||||
Element: Component layout is in accordance with job specifications, wiring and schematic diagrams | ||||||||
Element: Switchgear/control gear is fitted in accordance with work instructions, industry standards, manufacturer specifications and workplace procedures | ||||||||
Element: Interconnections are made in accordance with work instructions, industry standards and workplace procedures | ||||||||
Element: Regular quality checks are carried out in accordance with workplace procedures | ||||||||
Element: Completed switchboard function is tested in accordance with workplace procedures, industry standards and manufacturer specifications | ||||||||
Element: Labelling and numbering cable are undertaken in accordance with industry standards, wiring and schematic diagrams | ||||||||
Element: Unplanned events are referred to supervisor for directions in accordance with workplace procedures | ||||||||
Element: Assembly work is carried out without waste of materials or damage to apparatus, the surrounding environment or services and using sustainable energy practices | ||||||||
Element: Finalise and inspect assembled control gear and switchgear installation |
| |||||||
Element: Problem-solving techniques are used where corrective actions to assembled components are required in accordance with regulatory requirements and industry standards | ||||||||
Element: Work completion is documented and relevant person/s notified in accordance with workplace procedures |