Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEEAS0009 Mapping and Delivery Guide
Mount and wire control panel equipment
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEEAS0009 - Mount and wire control panel equipment | |
---|---|---|---|---|
Description | ||||
Employability Skills | ||||
Learning Outcomes and Application | This unit involves the skills and knowledge required to mount and wire control panel equipment. It includes working safely, following layout and circuit diagrams, selecting and mounting equipment, installing and terminating wiring, functional testing and completing necessary documentation.No licensing, legislative or certification requirements apply to this unit at the time of publication. | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
|
|||
Prerequisites/co-requisites | ||||
Competency Field | Assembly |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan to mount and wire control panel equipment |
| |||||||
Element: Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified and applied | ||||||||
Element: Work instructions, including layout and wiring diagrams, are applied in accordance with workplace procedures | ||||||||
Element: Advice is sought from supervisor to ensure work is coordinated effectively with others | ||||||||
Element: Materials required for the control panel work are obtained in accordance with workplace procedures | ||||||||
Element: Tools, equipment and measuring devices required to carry out control panel work are obtained and checked for correct operation and safety in accordance with workplace procedures | ||||||||
Element: Mount and wire control panel equipment |
| |||||||
Element: Circuits are checked and isolated in accordance with WHS/OHS workplace requirements and procedures | ||||||||
Element: Components are laid out in accordance with job specifications, wiring and schematic diagrams | ||||||||
Element: Control panel components including switch gear, interconnecting plugs and sockets and earthing are fitted in accordance with work instructions, industry standards, manufacturer specifications and workplace procedures | ||||||||
Element: Control panel wiring is installed in accordance with wiring and schematic diagrams, work instructions, industry standards, manufacturer specifications and workplace procedures | ||||||||
Element: Regular quality checks are carried out in accordance with workplace procedures | ||||||||
Element: Completed control panel is visually inspected and tested in accordance with workplace procedures, industry standards and manufacturer specifications | ||||||||
Element: Labelling and cable numbering are undertaken in accordance with industry standards, wiring and schematic diagrams | ||||||||
Element: Unplanned events are referred to supervisor for directions in accordance with workplace procedures | ||||||||
Element: Work is carried out without waste of materials or damage to apparatus, the surrounding environment or services and using sustainable energy practices | ||||||||
Element: Finalise and inspect control panel installation |
| |||||||
Element: Problem-solving techniques are used, where corrective actions to assembled components are required, in accordance with regulatory requirements and industry standards | ||||||||
Element: Work completion is documented and relevant person/s notified in accordance with workplace procedures |