Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEEDV0002 Mapping and Delivery Guide
Install aerial telecommunication cables
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEEDV0002 - Install aerial telecommunication cables | |
---|---|---|---|---|
Description | ||||
Employability Skills | ||||
Learning Outcomes and Application | This unit involves the skills and knowledge required to install aerial telecommunication cables.It includes working safely, installing catenary cable, fixing communication cables and completing documentation.No licensing, legislative or certification requirements apply to this unit at the time of publication. | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
|
|||
Prerequisites/co-requisites | ||||
Competency Field | Data and Voice |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to install aerial communication cables |
| |||||||
Element: WHS/OHS risks are identified, and risk control measures and workplace procedures are followed in preparation for the work | ||||||||
Element: Safety hazards not previously identified are noted and risk control measures implemented | ||||||||
Element: Cabling installation is prepared in consultation with others affected by the work and sequenced in accordance with workplace procedures | ||||||||
Element: Scope of work is determined from documentation and/or discussions with relevant person/s to establish the work to be undertaken | ||||||||
Element: Cable routes are planned in accordance with the precinct, structure, significants and relevant industry standards | ||||||||
Element: Advice is sought from relevant person/s to ensure the work is coordinated effectively with others | ||||||||
Element: Material required for installation work is obtained in accordance with workplace procedures and job specifications | ||||||||
Element: Tools, equipment and testing devices required for the installation work are obtained in accordance with workplace procedures and checked for correct operation and safety | ||||||||
Element: Preparatory work is checked to ensure no damage has occurred in accordance with relevant industry standards | ||||||||
Element: Install aerial communication cables |
| |||||||
Element: Poles are checked for soundness in accordance with workplace procedures | ||||||||
Element: Catenary cables are installed ensuring sufficient clearances are in accordance with relevant industry standards | ||||||||
Element: Cables are attached to catenary without strain or damage in accordance with relevant industry standards | ||||||||
Element: Cable ends are protected from damage in preparation for termination | ||||||||
Element: Methods for dealing with unplanned situations are discussed with relevant person/s for approval and documented in accordance with workplace procedures | ||||||||
Element: Unexpected situations are dealt with safely and with the approval of relevant person/s | ||||||||
Element: Quality checks of the installed aerial communication cables are conducted in accordance with workplace procedures | ||||||||
Element: Cable installation is carried out efficiently without waste of materials or damage to apparatus, circuits or the surrounding environment using sustainable energy practices | ||||||||
Element: Document and verify cabling installation |
| |||||||
Element: Worksite is cleaned and made safe in accordance with workplace procedures | ||||||||
Element: Documenting cable installation is carried out in accordance with workplace procedures |