UEEDV0014 Mapping and Delivery Guide
Test, report and rectify faults in data and voice installations
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEEDV0014 - Test, report and rectify faults in data and voice installations | |
---|---|---|---|---|
Description | ||||
Employability Skills | ||||
Learning Outcomes and Application | This unit involves the skills and knowledge required to test, report and rectify faults in data and voice installations.It includes working safely, conducting performance testing, applying fault-finding procedures, testing functionality of the network, conducting repairs and completing documentation.No licensing, legislative or certification requirements apply to this unit at the time of publication. | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
|
|||
Prerequisites/co-requisites | ||||
Competency Field | Data and Voice |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to test, report and rectify faults |
| |||||||
Element: Testing is prepared in consultation with others affected by work and sequenced in accordance with workplace procedures | ||||||||
Element: Scope of the work is determined from documentation and/or discussions with relevant person/s to establish the work to be undertaken | ||||||||
Element: Advice is sought from relevant person/s to ensure work is coordinated effectively with others | ||||||||
Element: Material needed for testing, reporting and rectifying work is obtained in accordance with workplace procedures and job requirements | ||||||||
Element: Tools, equipment and testing devices required for work are obtained in accordance with workplace procedures and checked for correct operation and safety | ||||||||
Element: Preparatory work is checked to ensure no damage has occurred in accordance with job requirements and workplace procedures | ||||||||
Element: Test and rectify faults |
| |||||||
Element: Tests are carried out in accordance with WHS/OHS requirements and workplace procedures | ||||||||
Element: Tests are prepared and conducted in accordance with test equipment operating instructions and job requirements | ||||||||
Element: Cable performance tests are conducted and results documented in accordance with workplace procedures | ||||||||
Element: Causes of defects and/or faults indicated by test results are identified and rectified in accordance with workplace procedures | ||||||||
Element: Methods for dealing with unplanned situations are discussed with relevant person/s for approval and documented in accordance with workplace procedures | ||||||||
Element: Unplanned situations are dealt with safely and with the approval of relevant person/s | ||||||||
Element: Quality checks of the installed equipment are undertaken in accordance with workplace procedures | ||||||||
Element: Testing and rectifying faults is carried out without waste of materials or damage to equipment, circuits, surrounding environment or services using sustainable energy principles | ||||||||
Element: Document and verify installation performance |
| |||||||
Element: Worksite is cleaned and made safe in accordance with workplace procedures | ||||||||
Element: Service reports are completed as required in accordance with workplace procedures | ||||||||
Element: Documentation certifying system performance is issued to relevant person/s |