Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEEEC0040 Mapping and Delivery Guide
Install commercial video/audio system components
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEEEC0040 - Install commercial video/audio system components | |
---|---|---|---|---|
Description | ||||
Employability Skills | ||||
Learning Outcomes and Application | This unit involves the skills and knowledge required to install commercial video/audio system components.It includes preparing to install audio/video components and systems, installing audio/video system components, completing installation work and reporting.Permits may be required for some work environments, such as confined spaces, working aloft, near live electrical apparatus and site rehabilitation.No licensing, legislative or certification requirements apply to this unit at the time of publication. | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
|
|||
Prerequisites/co-requisites | ||||
Competency Field | Electronics and Communications |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to install audio/video system components |
| |||||||
Element: Risk control measures are applied in accordance with workplace procedures prior to commencing work | ||||||||
Element: Risks/hazards are identified, assessed and reported to relevant person/s, and control measures implemented | ||||||||
Element: Nature and location of the work is obtained from relevant person/s to determine the scope of work | ||||||||
Element: Instructions for coordinating work with others are obtained from relevant person/s and applied | ||||||||
Element: Materials required for work are determined in accordance with workplace procedures | ||||||||
Element: Tools, equipment and testing devices required for work are obtained and checked for correct operation and safety | ||||||||
Element: Install audio/video system components |
| |||||||
Element: Circuits/equipment are checked and isolated, as required, in accordance with WHS/OHS requirements and workplace procedures | ||||||||
Element: Audio/video components are installed in accordance with relevant industry standards and job specifications with sufficient excess to effect terminations | ||||||||
Element: Accessories are installed straight and square in the required locations in accordance with relevant industry standards and job specifications | ||||||||
Element: Cables and conductors are terminated at accessories in accordance with manufacturer specifications and relevant industry standards | ||||||||
Element: Unplanned events are reported to relevant person/s in accordance with workplace procedures | ||||||||
Element: Installation is conducted efficiently without waste of materials, damage to apparatus, circuits or the surrounding environment applying sustainable energy practices | ||||||||
Element: Complete installation work and report |
| |||||||
Element: Worksite is cleaned and made safe in accordance with workplace procedures | ||||||||
Element: Relevant person/s is notified of installation completion in accordance with workplace procedures |