UEEEL0013 Mapping and Delivery Guide
Install, set up and commission interval metering
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEEEL0013 - Install, set up and commission interval metering | |
---|---|---|---|---|
Description | ||||
Employability Skills | ||||
Learning Outcomes and Application | This unit involves the skills and knowledge required to the install, set up and commission interval meter for measurement of energy use by consumers.It includes working safely in planning, installing and setting up interval electricity meter, and completing the necessary service metering documentation.The skills and knowledge described in this unit require a licence or permit to practice in the workplace where work is carried out on electrical installations which are designed to operate at voltages greater than 50 volt (V) alternating current (a.c.) or 120 V direct current (d.c.). Competency development activities in this unit are subject to regulations directly related to licensing. Where a licence or permit to practice is not held, a relevant contract of training, such as an Australian Apprenticeship, may be required. Additional and/or other conditions may apply in some jurisdictions subject to regulations related to electrical work. Practice in the workplace and during training is also subject to work health and safety (WHS)/occupational health and safety (OHS) regulations. | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
|
|||
Prerequisites/co-requisites | ||||
Competency Field | Electrical |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to install interval meter |
| |||||||
Element: Health and safety hazards are identified, risks assessed and risk control measures and workplace procedures implemented in preparation for the work | ||||||||
Element: Safety hazards not previously identified are noted on job safety assessments and existing risk control measures implemented | ||||||||
Element: Switchboard on which the meter is to be installed is inspected and evaluated for compliance with safety, functionality and industry standards | ||||||||
Element: Approval to rectify safety and/or functionality defects of the switchboard is sought from relevant person/s in accordance with workplace procedures | ||||||||
Element: Electrical meter installation and/or rectification work is prepared in consultation with relevant person/s effected by the work and sequenced appropriately | ||||||||
Element: Materials needed for meter work are obtained in accordance with workplace procedures and checked against job requirements and specifications | ||||||||
Element: Tools, equipment and testing devices needed for meter work are obtained in accordance with workplace procedures and checked for correct operation and safety | ||||||||
Element: Install interval meter |
| |||||||
Element: Need to test or measure live work is determined in accordance with WHS/OHS requirements and conducted within workplace safety procedures | ||||||||
Element: Existing meter is checked and isolated in accordance with WHS/OHS requirements and workplace procedures | ||||||||
Element: Approved rectification work is carried out to comply with industry standards and in accordance with workplace procedures | ||||||||
Element: Meter is installed to comply with relevant technical industry standards, job specifications and requirements | ||||||||
Element: Meter power and communication connections are made in accordance with manufacturer specifications, functional and regulatory requirements | ||||||||
Element: Meter operating parameters are set in accordance with manufacturer specifications, functional and regulatory requirements | ||||||||
Element: Unplanned situations are responded to in accordance with workplace procedures in a manner that minimises risk to personnel and equipment and with the approval of an authorised person/s | ||||||||
Element: Ongoing checks of the quality of installed apparatus are undertaken in accordance with workplace procedures | ||||||||
Element: Meter installation is carried out efficiently without unnecessary waste of materials or damage to apparatus circuits, the surrounding environment or services using sustainable energy principles | ||||||||
Element: Complete and report meter installation activity |
| |||||||
Element: Worksite is cleaned and made safe in accordance with workplace procedures | ||||||||
Element: Final inspection and tests are made to ensure the installed meter conforms to job requirements | ||||||||
Element: 'As-installed' meter or rectification work is documented and appropriate person/s notified in accordance with workplace procedures |