UEEEL0033 Mapping and Delivery Guide
Conduct electrical tests on LV electrical machines
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEEEL0033 - Conduct electrical tests on LV electrical machines | |
---|---|---|---|---|
Description | ||||
Employability Skills | ||||
Learning Outcomes and Application | This unit involves the skills and knowledge required to conduct electrical safety and functional inspections and tests of electrical machines designed to operate at low voltage (LV).It includes planning and conducting electrical inspections and tests on induction machines by working safely; setting up and conducting continuity, insulation and short circuit inspections and tests; and interpreting and documenting test results.The skills and knowledge described in this unit require a licence or permit to practice in the workplace where work is carried out on electrical installations which are designed to operate at voltages greater than 50 volt (V) alternating current (a.c.) or 120 V direct current (d.c.). Competency development activities in this unit are subject to regulations directly related to licensing. Where a licence or permit to practice is not held, a relevant contract of training, such as an Australian Apprenticeship, may be required. Additional and/or other conditions may apply in some jurisdictions subject to regulations related to electrical work. Practice in the workplace and during training is also subject to work health and safety (WHS)/occupational health and safety (OHS) regulations. | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
|
|||
Prerequisites/co-requisites | ||||
Competency Field | Electrical |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to conduct electrical inspections and tests on induction machines |
| |||||||
Element: Existing WHS/OHS risk control measures for work preparation are followed | ||||||||
Element: Scope of work is determined from job specifications and regulatory requirements | ||||||||
Element: Advice is sought from the work supervisor to ensure the work is coordinated effectively with others | ||||||||
Element: Winding data is obtained from winding data records or directly from measurements of stator and recorded in accordance with workplace procedures | ||||||||
Element: Materials required for the work are obtained in accordance with workplace procedures | ||||||||
Element: Tools, equipment and testing devices needed to carry out work are obtained and checked for correct operation and safety | ||||||||
Element: Conduct electrical inspections and tests on induction machines |
| |||||||
Element: Machines/equipment are inspected, checked and isolated in accordance with WHS/OHS requirements and workplace procedures | ||||||||
Element: Electrical inspection and tests are conducted to establish operational condition of the machine in accordance with workplace procedures and instructions | ||||||||
Element: Serviceability status of the machine is determined from inspection and test results and recorded | ||||||||
Element: Unplanned situations are responded to in accordance with workplace procedures in a manner that minimises risk to personnel and equipment | ||||||||
Element: Electrical testing is completed within timeframe, environment and workplace conditions | ||||||||
Element: Complete workplace reports |
| |||||||
Element: Serviceability status of the machine is documented in accordance with workplace procedures and appropriate person/s notified |