Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UEEEL0050 Mapping and Delivery Guide
Install and replace low voltage current transformer metering

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEEEL0050 - Install and replace low voltage current transformer metering
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to install and replace of low voltage (LV) current transformer (CT) metering.It includes preparing, installing and replacing LV CT metering. It also includes setting meter parameters and completing documentation.The skills and knowledge described in this unit require a licence or permit to practice in the workplace where work is carried out on electrical installations which are designed to operate at voltages greater than 50 volt (V) alternating current (a.c.) or 120 V direct current (d.c.).Competency development activities in this unit are subject to regulations directly related to licensing. Where a licence or permit to practice is not held, a relevant contract of training, such as an Australian Apprenticeship, may be required.Additional and/or other conditions may apply in some jurisdictions subject to regulations related to electrical work. Practice in the workplace and during training is also subject to work health and safety (WHS)/occupational health and safety (OHS) regulations.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Assessors must hold credentials specified within the Standards for Registered Training Organisations current at the time of assessment.

Assessment must satisfy the Principles of Assessment and Rules of Evidence and all regulatory requirements included within the Standards for Registered Training Organisations current at the time of assessment.

Assessment must occur in similar workplace operational situations where it is appropriate to do so; where this is not appropriate, assessment must occur in simulated similar workplace operational situations that replicate workplace conditions.

Assessment processes and techniques must be appropriate to the language, literacy and numeracy requirements of the work being performed and the needs of the candidate.

Resources for assessment must include access to:

a range of relevant exercises, case studies and/or simulations

relevant and appropriate materials, tools, facilities, equipment and PPE currently used in industry

applicable documentation, including workplace procedures, equipment specifications, regulations, relevant industry standards, codes of practice and operation manuals.

Prerequisites/co-requisites
Competency Field Electrical
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to install and replace LV CT metering
  • WHS/OHS requirements and workplace procedures for a given work area are identified and applied
       
Element: WHS/OHS hazards are identified, risks are assessed, and control measures are implemented for work preparation
       
Element: WHS/OHS hazards not previously identified are noted, risks assessed and risk control measures implemented
       
Element: Switchboard on which the meter/s and CTs are to be installed, inspected and tested are evaluated for compliance with safety and relevant industry standards
       
Element: Further work instructions for safety and/or functionality defects of the switchboard are sought from appropriate person/s in accordance with workplace procedures
       
Element: Installation of the meter, sequence and rectification work is prepared in consultation with relevant person/s
       
Element: Material needed for the work is obtained in accordance with workplace procedures and checked against work requirements
       
Element: Tools, equipment and testing devices needed for work are obtained in accordance with workplace procedures and checked for correct operation and safety
       
Element: Install and replace CT metering
  • WHS/OHS risk control measures and workplace procedures for carrying out the work are followed
       
Element: Need to test and measure live electrical work is determined in accordance with WHS/OHS requirements and workplace procedures
       
Element: Existing metering is checked and isolated in accordance with WHS/OHS requirements and workplace procedures
       
Element: Approved rectification work is carried out to comply with relevant industry standards and workplace procedures
       
Element: Meters and CTs are installed and replaced to comply with relevant industry standards and work specifications
       
Element: Metering power, functional requirements and communication connections, as required, are in accordance with manufacturer specifications and relevant industry standards
       
Element: Meter operating parameters and functional requirements are in accordance with manufacturer specifications and relevant industry standards
       
Element: Unplanned situations are responded to in accordance with workplace procedures and with the approval of an authorised person in a manner that minimises risk to personnel and equipment
       
Element: Quality checks of the installed apparatus are undertaken in accordance with workplace procedures
       
Element: Metering and CT installation is carried out efficiently without unnecessary waste of materials, services, damage to apparatus, circuits or environment using sustainable energy principles
       
Element: Complete and report metering installation activities
  • WHS/OHS work completion risk control measures and procedures are followed and supply is reinstated to the installation is accordance with workplace procedures
       
Element: Worksite is cleaned and made safe in accordance with workplace procedures
       
Element: Quality checks of the installed metering and CTs is in accordance with relevant industry standards
       
Element: Metering and CT work is documented and appropriate person/s notified in accordance with workplace procedures
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least one occasion and include:

inspecting and evaluating safety and functionality compliance of the switchboard accurately

following established procedures to obtain approval to rectify non-compliance aspects of the switchboard

carrying out preparation work effectively

rectifying compliance defects

placing and securing metering correctly

making power and communications connections in accordance with manufacturer specifications and functional and regulatory requirements

setting meter parameters in accordance with manufacture's specifications and functional and regulatory requirements

reinstating supply to the installation safely

documenting current transformer(CT) metering and rectification work and notifying appropriate persons in accordance with established procedures

dealing with unplanned events

applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements, including using risk control measures

applying sustainable energy practices

completing activities

following quality, workplace procedures and instructions

preparing, installing and replacing CT energy metering

selecting metering and CT components

using tools, equipment, personal protective equipment (PPE) and testing devices

reporting work activities.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions and include knowledge of:

low voltage (LV) CT metering, including:

CTs encompassing:

uses and functions

AS 60044.1-2007 Instrument transformers - Current transformers, requirements

characteristics and saturation

differences between metering and protection CTs

standard ratios and outputs

accurate range of loading

thermal current limit

burden and connecting cable length

short circuiting secondary as a safety issue

accuracy class

revenue meter types used with CTs:

CT installations encompassing:

uses in the regulated market and relevant regulations

types and mounting methods

switchboard layouts (various distributors)

minimum spacing of CTs

connections to single and polyphase revenue meters

consequence of polarity reversal in one phase of a polyphase meter

problem-solving techniques

relevant industry standards

relevant quality workplace procedures

relevant tools, equipment and testing devices

relevant job safety assessments or risk mitigation processes

relevant manufacturer specifications and operating instructions

relevant sustainable energy practices

relevant WHS/OHS legislated requirements

relevant workplace documentation

relevant workplace policies, procedures and instructions.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEE Electrotechnology Training Package Companion Volume Implementation Guide.

Installing and replacing LV CT must include at least two of the following different installations:

LV CT installation using single phase meters

LV CT installation using a polyphase meter

metering installation where compliance rectification work is required

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
WHS/OHS requirements and workplace procedures for a given work area are identified and applied 
 
 
 
 
 
 
 
WHS/OHS risk control measures and workplace procedures for carrying out the work are followed 
 
 
 
 
 
 
 
 
 
WHS/OHS work completion risk control measures and procedures are followed and supply is reinstated to the installation is accordance with workplace procedures 
 
 
 

Forms

Assessment Cover Sheet

UEEEL0050 - Install and replace low voltage current transformer metering
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEEEL0050 - Install and replace low voltage current transformer metering

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: