UEEEL0073 Mapping and Delivery Guide
Verify compliance and functionality of special LV electrical installations

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEEEL0073 - Verify compliance and functionality of special LV electrical installations
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to verify compliance and functionality of a special low voltage (LV) electrical installation.It includes preparing for testing and visual inspection for verifying an electrical installation, and completing reporting and recommendations of finding.The skills and knowledge described in this unit require a licence or permit to practice in the workplace where work is carried out on electrical installations which are designed to operate at voltages greater than 50 volt (V) alternating current (a.c.) or 120 V direct current (d.c.).Competency development activities in this unit are subject to regulations directly related to licensing. Additional and/or other conditions may apply in some jurisdictions subject to regulations related to electrical work. Practice in the workplace and during training is also subject to work health and safety (WHS)/occupational health and safety (OHS) regulations.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Assessors must hold credentials specified within the Standards for Registered Training Organisations current at the time of assessment.

Assessment must satisfy the Principles of Assessment and Rules of Evidence and all regulatory requirements included within the Standards for Registered Training Organisations current at the time of assessment.

Assessment must occur in suitable workplace operational situations where it is appropriate to do so; where this is not appropriate, assessment must occur in simulated suitable workplace operational situations that replicate workplace conditions.

Assessment processes and techniques must be appropriate to the language, literacy and numeracy requirements of the work being performed and the needs of the candidate.

Resources for assessment must include access to:

a range of relevant exercises, case studies and/or simulations

relevant and appropriate materials, tools, facilities, equipment and personal protective equipment (PPE) currently used in industry

applicable documentation, including workplace procedures, equipment specifications, regulations, relevant industry standards, codes of practice and operation manuals.

Prerequisites/co-requisites
Competency Field Electrical
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to inspect and test an electrical installation
  • Work health and safety (WHS)/occupational health and safety (OHS) measures for the site are identified, obtained and applied
       
Element: WHS/OHS risk control measures and procedures in preparation for the work are followed
       
Element: WHS/OHS hazards not previously identified are noted, risks assessed and risk control measures implemented
       
Element: Installation documentation and relevant industry standard are reviewed and applied
       
Element: Appropriate person/s is consulted to ensure the work is coordinated effectively with others
       
Element: Tools, equipment and testing devices needed to verify compliance are obtained in accordance with workplace procedures and checked for operation and safety
       
Element: Preparatory work is checked to ensure no damage has occurred in accordance with workplace procedures
       
Element: Visually inspect the installation
  • WHS/OHS risk control measures and procedures for carrying out the work are followed
       
Element: Need to inspect, test and measure live work is determined in accordance with WHS/OHS requirements and workplace procedures
       
Element: Circuits/machines/plant are checked and isolated in accordance with WHS/OHS requirements and workplace procedures
       
Element: Installed wiring is checked for suitability for the environments and protected from damage and overheating
       
Element: Cable conductor sizes acquired are inspected to meet current-carrying capacity requirements, voltage-drop and fault-loop impedance limitations in accordance with relevant industry standards
       
Element: Inspection protection methods and devices are validated to meet coordination requirements for overload and short circuit protection in accordance with relevant industry standards
       
Element: Switchgear and control gear are inspected, validated and appropriately rated to meet functional requirements in accordance with relevant industry standards
       
Element: Electrical equipment is checked for compliance with safety requirements in accordance with relevant industry standards
       
Element: Earthing system components are checked, located and conductors correctly sized in accordance with relevant industry standards
       
Element: Markings on switchboards are checked for accuracy and clarity in accordance with relevant industry standards
       
Element: Conduct safety testing
  • WHS/OHS risk control measures and procedures for carrying out the work are followed
       
Element: Need to test and measure live electrical work is conducted in accordance with WHS/OHS requirements and workplace procedures
       
Element: Mandatory tests are conducted to verify earthing conductor resistance is sufficiently low; insulation resistance is sufficiently high; polarities are correct; circuit connections are correct; and tests are in accordance with relevant industry standards
       
Element: Inspection and testing are conducted to verify fault-loop impedance is sufficiently low and residual current device (RCD) operates as intended in accordance with job requirements and relevant industry standards
       
Element: Report inspection and test findings
  • WHS/OHS risk control work completion measures and workplace procedures are followed
       
Element: Worksite is cleaned and made safe in accordance with workplace procedures
       
Element: Non-compliance defects are identified and reported in accordance with workplace procedures
       
Element: Recommendations for rectifying defects are made in accordance with workplace procedures
       
Element: Mandatory documentation is completed in accordance with workplace procedures
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least one occasion and include:

selecting correct tools and testing equipment

identifying visual non-compliance defects

using effective methods for conducting mandatory and optional tests

identifying non-compliance from test results

identifying causes of non-compliance

completing mandatory reporting

dealing with unplanned events

applying relevant work health and safety (WHS)/occupational health and safety (OHS requirements, including using risk control measures

preparing, inspecting and testing an electrical installation

reporting inspection and test findings

reviewing relevant industry documentation.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions and include knowledge of:

electrical installations, testing, compliance and functionality verification of special electrical installations, including:

technical standards, regulations and codes for special electrical installations encompassing:

additional requirements for special installations

caravan parks

construction and demolition sites

marinas

medical treatment areas

moveable premises

high voltage (HV) installation in consumer’s premises

mandatory and optional testing and verification requirements applicable to special installations encompassing:

testing techniques

features of special installations that can be visually inspected

caravan parks

construction and demolition sites

marinas

medical treatment areas

moveable premises

HV installation in consumer’s premises

relevant industry standards

relevant job safety assessments or risk mitigation processes

relevant WHS/OHS legislated requirements

relevant workplace documentation

relevant workplace policies and procedures.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEE Electrotechnology Training Package Companion Volume Implementation Guide.

Verifying compliance and functionality must include at least two types of installations from the following:

caravan parks

construction and demolition sites

marinas

medical treatment areas

moveable premises

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work health and safety (WHS)/occupational health and safety (OHS) measures for the site are identified, obtained and applied 
 
 
 
 
 
 
WHS/OHS risk control measures and procedures for carrying out the work are followed 
 
 
 
 
 
 
 
 
 
WHS/OHS risk control measures and procedures for carrying out the work are followed 
 
 
 
WHS/OHS risk control work completion measures and workplace procedures are followed 
 
 
 
 

Forms

Assessment Cover Sheet

UEEEL0073 - Verify compliance and functionality of special LV electrical installations
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEEEL0073 - Verify compliance and functionality of special LV electrical installations

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent