UEEEL0078 Mapping and Delivery Guide
Install and commission whole current electricity meters
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEEEL0078 - Install and commission whole current electricity meters |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to install whole current meter |
| |||||||
Element: Appropriate electricity meter and enclosure are identified and confirmed in accordance with workplace procedures | ||||||||
Element: Customer is advised of proposed work and scheduling in accordance with job requirements/specifications and workplace procedures | ||||||||
Element: Work Health and Safety (WHS) / Occupational Health and Safety (OHS) requirements and relevant workplace procedures including de-energising, isolation and energising are identified and implemented | ||||||||
Element: Hazards are identified, risks assessed, and risk control measures and Safe Work Method Statements (SWMS) applied | ||||||||
Element: Switchboard on which the meter is to be installed is inspected and evaluated for compliance with safety and functionality requirements and industry standards | ||||||||
Element: Approval to rectify safety and/or functionality defects identified by visual inspection of the switchboard is sought from relevant person/s in accordance with workplace procedures | ||||||||
Element: Installation and any rectification work is planned and sequenced appropriately in consultation with relevant person/s and in accordance legislative framework | ||||||||
Element: Confirmation that safe isolation of the installation, access to a communication’s connection and implementation of any relevant safeguards to associated metering services can be completed in accordance with job requirements is obtained | ||||||||
Element: Resources, materials, tools, equipment and testing devices are obtained and checked for correct operation and safety and against job requirements and specifications in accordance with workplace procedures | ||||||||
Element: Personal Protective Equipment (PPE) is selected, checked and used accordance with workplace procedures | ||||||||
Element: Install whole current electricity meter |
| |||||||
Element: Pre installation tests and assessments are carried out, correct meter to be replaced confirmed and information documented in accordance with workplace procedures | ||||||||
Element: Approval to rectify safety and/or functionality defects identified by testing and assessment is sought from relevant person/s in accordance with workplace procedures | ||||||||
Element: Work activities outside of the limits of own authority and/or qualification are identified, and assistance sought if required in accordance with operating instructions and workplace procedures | ||||||||
Element: Existing meter is isolated by authorised person and checked and tested to confirm ‘deenergised’ in accordance with workplace procedures and WHS/OHS requirements | ||||||||
Element: Approved rectification work is carried out to comply with industry standards and in accordance with workplace procedures | ||||||||
Element: Meter is installed to comply with relevant technical industry standards, job specifications and workplace procedures and requirements | ||||||||
Element: Meter power and communication connections, and where required communications technology device installation, are made in accordance with manufacturer and job specifications and workplace procedures | ||||||||
Element: Meter is configured and functionality confirmed in accordance with manufacturer specifications and workplace procedures | ||||||||
Element: Work progress is monitored against the approved pre-start risk assessment (workplan) and adjustments to the plan made, as required, in accordance with workplace procedures | ||||||||
Element: Test procedures are performed to establish and confirm a neutral integrity test point (NITP), integrity of MEN, phase rotation where applicable, and main earth connections in accordance with workplace procedures | ||||||||
Element: Ongoing checks of the quality of installation are undertaken in accordance with workplace procedures | ||||||||
Element: Installation is carried out efficiently without unnecessary waste of materials or damage to apparatus circuits, the surrounding environment or services using sustainable energy principles | ||||||||
Element: Unplanned situations are responded to in accordance with workplace procedures in a manner that minimises risk to personnel and equipment | ||||||||
Element: Complete meter installation activity and report completion of work |
| |||||||
Element: Supply is reinstated 'energised' to the installation in accordance with workplace procedures | ||||||||
Element: Final inspection and tests are made to ensure the installation conforms to job requirements and workplace procedures | ||||||||
Element: Worksite and tools are cleaned and made safe, and waste disposed of, in accordance with workplace procedures | ||||||||
Element: Where required, hazardous waste is removed and disposed of in accordance with regulatory requirements and workplace procedures | ||||||||
Element: Final visual inspection of installation and work area is performed to ensure the work site is left clean of any hazardous materials or substances in accordance with workplace procedures | ||||||||
Element: ‘As-installed' meter or rectification work is documented, and appropriate person/s notified in accordance with workplace procedures | ||||||||
Element: Installation and certification compliance report/s and other documentation is updated and submitted, as required, in accordance with workplace procedures | ||||||||
Element: Work supervisor or authorised person/s notified of completion of work and the completion of activity is documented in accordance with the pre-start risk assessment (workplan) | ||||||||
Element: Metering installation work outcomes, configurations and completion of work is communicated to the customer in accordance with workplace procedures |