UEEEL0078 Mapping and Delivery Guide
Install and commission whole current electricity meters

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEEEL0078 - Install and commission whole current electricity meters
Description
Employability Skills
Learning Outcomes and Application
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to install whole current meter
  • Scope of work activity is confirmed from the work order / instruction, in consultation with supervisor / authorised person
       
Element: Appropriate electricity meter and enclosure are identified and confirmed in accordance with workplace procedures
       
Element: Customer is advised of proposed work and scheduling in accordance with job requirements/specifications and workplace procedures
       
Element: Work Health and Safety (WHS) / Occupational Health and Safety (OHS) requirements and relevant workplace procedures including de-energising, isolation and energising are identified and implemented
       
Element: Hazards are identified, risks assessed, and risk control measures and Safe Work Method Statements (SWMS) applied
       
Element: Switchboard on which the meter is to be installed is inspected and evaluated for compliance with safety and functionality requirements and industry standards
       
Element: Approval to rectify safety and/or functionality defects identified by visual inspection of the switchboard is sought from relevant person/s in accordance with workplace procedures
       
Element: Installation and any rectification work is planned and sequenced appropriately in consultation with relevant person/s and in accordance legislative framework
       
Element: Confirmation that safe isolation of the installation, access to a communication’s connection and implementation of any relevant safeguards to associated metering services can be completed in accordance with job requirements is obtained
       
Element: Resources, materials, tools, equipment and testing devices are obtained and checked for correct operation and safety and against job requirements and specifications in accordance with workplace procedures
       
Element: Personal Protective Equipment (PPE) is selected, checked and used accordance with workplace procedures
       
Element: Install whole current electricity meter
  • Need to test or measure live work is determined in accordance with WHS/OHS requirements, workplace procedures and SWMS
       
Element: Pre installation tests and assessments are carried out, correct meter to be replaced confirmed and information documented in accordance with workplace procedures
       
Element: Approval to rectify safety and/or functionality defects identified by testing and assessment is sought from relevant person/s in accordance with workplace procedures
       
Element: Work activities outside of the limits of own authority and/or qualification are identified, and assistance sought if required in accordance with operating instructions and workplace procedures
       
Element: Existing meter is isolated by authorised person and checked and tested to confirm ‘deenergised’ in accordance with workplace procedures and WHS/OHS requirements
       
Element: Approved rectification work is carried out to comply with industry standards and in accordance with workplace procedures
       
Element: Meter is installed to comply with relevant technical industry standards, job specifications and workplace procedures and requirements
       
Element: Meter power and communication connections, and where required communications technology device installation, are made in accordance with manufacturer and job specifications and workplace procedures
       
Element: Meter is configured and functionality confirmed in accordance with manufacturer specifications and workplace procedures
       
Element: Work progress is monitored against the approved pre-start risk assessment (workplan) and adjustments to the plan made, as required, in accordance with workplace procedures
       
Element: Test procedures are performed to establish and confirm a neutral integrity test point (NITP), integrity of MEN, phase rotation where applicable, and main earth connections in accordance with workplace procedures
       
Element: Ongoing checks of the quality of installation are undertaken in accordance with workplace procedures
       
Element: Installation is carried out efficiently without unnecessary waste of materials or damage to apparatus circuits, the surrounding environment or services using sustainable energy principles
       
Element: Unplanned situations are responded to in accordance with workplace procedures in a manner that minimises risk to personnel and equipment
       
Element: Complete meter installation activity and report completion of work
  • WHS/OHS work completion risk control measures and workplace procedures are followed
       
Element: Supply is reinstated 'energised' to the installation in accordance with workplace procedures
       
Element: Final inspection and tests are made to ensure the installation conforms to job requirements and workplace procedures
       
Element: Worksite and tools are cleaned and made safe, and waste disposed of, in accordance with workplace procedures
       
Element: Where required, hazardous waste is removed and disposed of in accordance with regulatory requirements and workplace procedures
       
Element: Final visual inspection of installation and work area is performed to ensure the work site is left clean of any hazardous materials or substances in accordance with workplace procedures
       
Element: ‘As-installed' meter or rectification work is documented, and appropriate person/s notified in accordance with workplace procedures
       
Element: Installation and certification compliance report/s and other documentation is updated and submitted, as required, in accordance with workplace procedures
       
Element: Work supervisor or authorised person/s notified of completion of work and the completion of activity is documented in accordance with the pre-start risk assessment (workplan)
       
Element: Metering installation work outcomes, configurations and completion of work is communicated to the customer in accordance with workplace procedures
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Scope of work activity is confirmed from the work order / instruction, in consultation with supervisor / authorised person 
 
 
 
 
 
 
 
 
 
 
Need to test or measure live work is determined in accordance with WHS/OHS requirements, workplace procedures and SWMS 
 
 
 
 
 
 
 
 
 
 
 
 
 
WHS/OHS work completion risk control measures and workplace procedures are followed 
 
 
 
 
 
 
 
 
 

Forms

Assessment Cover Sheet

UEEEL0078 - Install and commission whole current electricity meters
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEEEL0078 - Install and commission whole current electricity meters

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: