Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEEHA0020 Mapping and Delivery Guide
Conduct detailed inspection of electrical installations for hazardous areas
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEEHA0020 - Conduct detailed inspection of electrical installations for hazardous areas |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare for inspection |
| |||||||
Element: Knowledge of the scope of detailed inspections specified in inspection standards and site inspection program is applied to work preparation | ||||||||
Element: Classification of the area is ascertained from hazardous area layout drawings retained in the verification dossier | ||||||||
Element: Type and grade of inspection is ascertained from the inspection schedule retained in the verification dossier | ||||||||
Element: Classification details and specified location of each item of equipment and circuits subject to inspection are determined from design drawings and equipment certification documentation retained in the verification dossier | ||||||||
Element: Special tools, equipment and testing devices needed to carry out the inspection are checked to ensure they are safe and serviceable, and any defective items are either rectified or replaced |
| |||||||
Element: Knowledge of the explosion-protection aspects of equipment and hazardous area installation requirements is applied | ||||||||
Element: Equipment, systems and installation are inspected for compliance with the design specifications retained in the verification dossier and in accordance with the inspection schedule and standards | ||||||||
Element: Where applicable in a given jurisdiction, an appropriately authorised person is directed to remove equipment enclosure covers and internal components, where needed, to enable inspection | ||||||||
Element: Arrangements are made to store and protect equipment covers and components that are removed to enable inspection | ||||||||
Element: Where applicable in a given jurisdiction, after the inspection of each item, an appropriately authorised person is directed to replace equipment covers and components in a manner that ensures the integrity of the explosion-protection system | ||||||||
Element: Record results of detailed inspection |
| |||||||
Element: Defects such as equipment deterioration, faults and unauthorised modifications are recorded in accordance with inspection standards | ||||||||
Element: Actions to rectify defects are specified in the inspection record | ||||||||
Element: The inspection record is forwarded to the appropriate personnel for inclusion in the verification dossier in accordance with inspection standards |