Install explosion-protected equipment and associated apparatus and wiring systems

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEEHA0025 - Install explosion-protected equipment and associated apparatus and wiring systems
Description
Employability Skills
Learning Outcomes and Application
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to install equipment and wiring
  • WHS/OHS procedures and safe work methods are obtained and interpreted
       
Element: Knowledge of requirements for installing electrical equipment and wiring for a hazardous area is applied to work preparation
       
Element: Types of explosion-protected equipment and wiring systems to be installed are determined from the area classification and planning and/or design documentation
       
Element: Location in which specific items of equipment and circuits are to be installed is determined from the area classification and planning and/or design documentation
       
Element: Explosion-protected equipment markings are checked to ensure they conform to their certification document and planning and/or design specifications
       
Element: Certification document supplied with each item of equipment is collected for forwarding to the relevant person for filing in the verification dossier
       
Element: Cables and cable enclosures to be installed are checked to ensure they conform to planning and/or design documentation
       
Element: Cable glands, seals and conductor terminations are checked to ensure they are compatible with the cable types and equipment specified in the planning and/or design documentation
       
Element: Special tools, equipment and testing devices needed to carry out the installation work are checked to ensure they are safe and serviceable, and any defective items are either rectified or replaced
       
Element: Install equipment and wiring systems
  • Safe work methods statements (SWMS) relating to explosive atmospheres are obtained and applied
       
Element: Installation of equipment and wiring systems demonstrates application of knowledge of requirements for installing electrical equipment and wiring for hazardous areas
       
Element: Equipment enclosure covers and internal components are removed where needed to enable installation and covers, components and their fixing devices are stored to protect them against loss or damage
       
Element: Equipment is installed to conform with the planning and/or design documentation, installation standards and within the limits specified by the equipment certification and manufacturer’s instructions
       
Element: Equipment is installed in a manner that maintains the integrity of protection afforded by the equipment type
       
Element: Cables and conduits are installed to conform with installation standards, planning and/or design documentation
       
Element: Cables and conduits are terminated to conform with installation standards and equipment certification and manufacturer’s instructions
       
Element: Circuits are tested before connecting them to devices to ensure protective earth resistance is sufficiently low, insulation resistance is safe, polarity and connections are correct and each circuit complies with installation standards
       
Element: Conductors are terminated and connected complying with planning and/or design documentation, installation standards, equipment certification and manufacturer’s instructions
       
Element: Equipment covers and internal components are removed to enable installation and are replaced ensuring the integrity of the equipment type is not compromised
       
Element: Confirm that installation is complete
  • Appropriate person/s is notified that the installation has been completed and is ready for the initial inspection
       
Element: Action is taken to rectify non-conformance and general installation defects found during the initial inspection and to ensure the installation complies with requirements
       
Element: Documents used during the installation are forwarded to the person responsible for compiling the verification dossier
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
WHS/OHS procedures and safe work methods are obtained and interpreted 
 
 
 
 
 
 
 
 
Safe work methods statements (SWMS) relating to explosive atmospheres are obtained and applied 
 
 
 
 
 
 
 
 
 
Appropriate person/s is notified that the installation has been completed and is ready for the initial inspection 
 
 

Forms

Assessment Cover Sheet

UEEHA0025 - Install explosion-protected equipment and associated apparatus and wiring systems
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEEHA0025 - Install explosion-protected equipment and associated apparatus and wiring systems

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: