Install explosion-protected equipment and associated apparatus and wiring systems
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEEHA0025 - Install explosion-protected equipment and associated apparatus and wiring systems |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to install equipment and wiring |
| |||||||
Element: Knowledge of requirements for installing electrical equipment and wiring for a hazardous area is applied to work preparation | ||||||||
Element: Types of explosion-protected equipment and wiring systems to be installed are determined from the area classification and planning and/or design documentation | ||||||||
Element: Location in which specific items of equipment and circuits are to be installed is determined from the area classification and planning and/or design documentation | ||||||||
Element: Explosion-protected equipment markings are checked to ensure they conform to their certification document and planning and/or design specifications | ||||||||
Element: Certification document supplied with each item of equipment is collected for forwarding to the relevant person for filing in the verification dossier | ||||||||
Element: Cables and cable enclosures to be installed are checked to ensure they conform to planning and/or design documentation | ||||||||
Element: Cable glands, seals and conductor terminations are checked to ensure they are compatible with the cable types and equipment specified in the planning and/or design documentation | ||||||||
Element: Special tools, equipment and testing devices needed to carry out the installation work are checked to ensure they are safe and serviceable, and any defective items are either rectified or replaced | ||||||||
Element: Install equipment and wiring systems |
| |||||||
Element: Installation of equipment and wiring systems demonstrates application of knowledge of requirements for installing electrical equipment and wiring for hazardous areas | ||||||||
Element: Equipment enclosure covers and internal components are removed where needed to enable installation and covers, components and their fixing devices are stored to protect them against loss or damage | ||||||||
Element: Equipment is installed to conform with the planning and/or design documentation, installation standards and within the limits specified by the equipment certification and manufacturer’s instructions | ||||||||
Element: Equipment is installed in a manner that maintains the integrity of protection afforded by the equipment type | ||||||||
Element: Cables and conduits are installed to conform with installation standards, planning and/or design documentation | ||||||||
Element: Cables and conduits are terminated to conform with installation standards and equipment certification and manufacturer’s instructions | ||||||||
Element: Circuits are tested before connecting them to devices to ensure protective earth resistance is sufficiently low, insulation resistance is safe, polarity and connections are correct and each circuit complies with installation standards | ||||||||
Element: Conductors are terminated and connected complying with planning and/or design documentation, installation standards, equipment certification and manufacturer’s instructions | ||||||||
Element: Equipment covers and internal components are removed to enable installation and are replaced ensuring the integrity of the equipment type is not compromised | ||||||||
Element: Confirm that installation is complete |
| |||||||
Element: Action is taken to rectify non-conformance and general installation defects found during the initial inspection and to ensure the installation complies with requirements | ||||||||
Element: Documents used during the installation are forwarded to the person responsible for compiling the verification dossier |