Qualification | - |
Unit of Competency | UEEIC0003 - Assist in commissioning process and instrumentation control systems | |
---|---|---|---|---|
Description | ||||
Employability Skills | ||||
Learning Outcomes and Application | This unit involves the skills and knowledge required to assist in commissioning of process control systems. It includes working safely and with others, complying with requirements, applying knowledge of process and control components, pre-commissioning tests, checking and adjusting components and controls to ensure efficient and safe operation and completing commissioning documentation.Permits may be required for some work environments, such as confined spaces, working aloft, near live electrical apparatus and site rehabilitation.No licensing, legislative or certification requirements apply to this unit at the time of publication. | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
|
|||
Prerequisites/co-requisites | ||||
Competency Field | Instrumentation & Control |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to assist in commissioning process control systems |
| |||||||
Element: WHS/OHS risk control measures and workplace procedures are followed in preparation for work | ||||||||
Element: Safety hazards that have not previously been identified are noted and risk control measures implemented | ||||||||
Element: Commissioning plan is reviewed with relevant team members to ensure commissioning role/s of members are identified and ensure work is coordinated effectively in accordance with workplace procedures | ||||||||
Element: Measurement parameters are identified with team in accordance with workplace procedures, process requirements and manufacturer instructions | ||||||||
Element: Tools, equipment and testing devices required for work are obtained in accordance with workplace procedures and checked for correct operation and safety | ||||||||
Element: Preparatory work is checked to ensure no damage has occurred and work is in accordance with relevant industry standards | ||||||||
Element: Need to test and measure live work is determined in accordance with WHS/OHS requirements and workplace procedures | ||||||||
Element: Circuits are checked and isolated in accordance with WHS/OHS requirements and workplace procedures | ||||||||
Element: Assist in commissioning process control systems |
| |||||||
Element: Commissioning testing/measuring devices are connected and set up in accordance with relevant industry standards for control system and work instructions | ||||||||
Element: Process instruments and apparatus are set up and adjusted in accordance with relevant industry standards, process control requirements, equipment manufacturer instructions and work instructions | ||||||||
Element: Adjustments are made to provide optimum transmission/reception performance in accordance with relevant industry standards | ||||||||
Element: Decisions for dealing with unplanned situations are made from discussions with relevant person/s and/or job specifications | ||||||||
Element: Methods for dealing with unplanned situations are selected in accordance with WHS/OHS requirements and job specifications | ||||||||
Element: Commissioning assistance is carried out efficiently without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy principles | ||||||||
Element: Complete and report commissioning activities |
| |||||||
Element: Worksite is cleaned and made safe in accordance with workplace procedures | ||||||||
Element: Adjustment settings are documented and relevant person/s notified in accordance with workplace procedures |