Learning Outcomes and Application | This unit involves the skills and knowledge required to set up gas analysis measuring and control instruments.It includes working safely, identifying measuring parameters, testing and measuring work, following isolating procedures, arranging measuring instruments, dealing with unplanned situations and following documenting procedures.Permits may be required for some work environments, such as confined spaces, working aloft, near live electrical apparatus and site rehabilitation.No licensing, legislative or certification requirements apply to this unit at the time of publication. | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
|
|||
Prerequisites/co-requisites | ||||
Competency Field | Instrumentation & Control |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to arrange gas analysis measuring instruments |
| |||||||
Element: WHS/OHS risk control measures and workplace procedures are followed in preparation for work | ||||||||
Element: Safety hazards that have not previously been identified are noted and risk control measures implemented | ||||||||
Element: Relevant person/s is consulted to ensure work is coordinated effectively with others involved on worksite | ||||||||
Element: Measurement parameters are identified by reviewing process requirements and instrument manufacturer instructions | ||||||||
Element: Tools, equipment and testing devices required for work are obtained in accordance with workplace procedures and checked for correct operation and safety | ||||||||
Element: Preparatory work is checked to ensure no damage has occurred and work is in accordance with workplace procedures | ||||||||
Element: Need to test and measure live work is determined in accordance with WHS/OHS requirements and workplace procedures | ||||||||
Element: Circuits/machines/plant are checked and isolated in accordance with WHS/OHS requirements and workplace procedures | ||||||||
Element: Arrange gas analysis measuring instruments |
| |||||||
Element: Testing/measuring devices are connected and arranged in accordance with relevant industry standards and control system | ||||||||
Element: Measuring instruments are arranged and adjusted in accordance with workplace procedures and instrument manufacturer instructions | ||||||||
Element: Methods for dealing with unplanned situations are discussed with relevant person/s and documented | ||||||||
Element: Unplanned situations are dealt with safely and with approval of a relevant person/s | ||||||||
Element: Work is carried out efficiently without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy principles | ||||||||
Element: Complete and report set-up activities |
| |||||||
Element: Worksite is cleaned and made safe in accordance with workplace procedures | ||||||||
Element: Adjustment settings are documented and relevant person/s notified in accordance with workplace procedures |