Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UEEIC0038 Mapping and Delivery Guide
Solve problems in density/level measurement components and systems

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEEIC0038 - Solve problems in density/level measurement components and systems
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to set up density/level measurement components and systems and provide solutions to a problem as it applies to a process and control work function.It includes working safely, setting up and calibrating density/level measuring components and systems, applying problem-solving techniques, using of a range of measuring devices, and providing solutions derived from measurements and calculations to problems in density/level measurement components and systems.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Assessors must hold credentials specified within the Standards for Registered Training Organisations current at the time of assessment.

Assessment must satisfy the Principles of Assessment and Rules of Evidence and all regulatory requirements included within the Standards for Registered Training Organisations current at the time of assessment.

Assessment must occur in workplace operational situations where it is appropriate to do so; where this is not appropriate, assessment must occur in simulated workplace operational situations that replicate workplace conditions.

Assessment processes and techniques must be appropriate to the language, literacy and numeracy requirements of the work being performed and the needs of the candidate.

Resources for assessment must include access to:

a range of relevant exercises, case studies and/or other simulations

relevant and appropriate materials, tools, equipment and personal protective equipment (PPE) currently used in industry

applicable documentation, including workplace procedures, equipment specifications, regulations, codes of practice and operation manuals.

Prerequisites/co-requisites
Competency Field Instrumentation & Control
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to work on density/level measurement components and system
  • Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are obtained and applied
       
Element: Hazards are identified, risks assessed and control measures implemented
       
Element: Nature of the density/level measurement problem is identified from documentation or appropriate person/s to determine the scope of work to be undertaken
       
Element: Appropriate person/s is consulted to ensure work is coordinated effectively with others
       
Element: Materials required for the work are determined in accordance with workplace procedures
       
Element: Tools, equipment and testing devices needed to carry out the work are obtained and checked for correct operation and safety in accordance with workplace procedures
       
Element: Solve density/level measurement problems
  • WHS/OHS risk control work measures and workplace procedures are followed
       
Element: Need to inspect, test or measure electrical components of live electrical work is determined in accordance with job requirements and workplace safety procedures
       
Element: Density/level measurement apparatus is checked and isolated in accordance with WHS/OHS requirements and workplace procedures
       
Element: Relevant methods are used to solve measurement problems from tests and calculated values as they apply to density/level measurement systems
       
Element: Unplanned situations are responded to in accordance with workplace procedures and with the approval of an authorised person/s
       
Element: Problems are resolved using sustainable energy principles and without damage to apparatus, the surrounding environment or services in accordance with workplace procedures
       
Element: Complete work and document work activities
  • WHS/OHS work completion risk control measures and workplace procedures are followed
       
Element: Worksite is cleaned and made safe in accordance with workplace procedures
       
Element: Justification for solutions used to resolve density/level measurement problems is documented
       
Element: Work completion is documented and appropriate person/s notified in accordance with workplace procedures
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least two separate occasions and include:

applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements, including applying safe working practices

applying sustainable energy principles and practices

cleaning and making work site safe

completing work and documenting work activities

dealing with unplanned events/situations in accordance with workplace procedures in a manner that minimises risk to personnel and equipment

documenting completed work

implementing risk control measures

obtaining tools, equipment and testing devices

determining work on density/level measurement components and systems

solving density/level measurement problems

solving problems in density/level measurement systems

working with density/level apparatus.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions and include knowledge of:

introduction to level/density measurement. including:

definitions density and relative density (sg)

application

factors affecting density

density measurement

Archimedes principle

density calculations

types and applications of level/density transducers

transducers input/outputs (I/O) - measurement and evaluation

transducer connections

level/density measurement techniques sight type, including:

dipstick and hook gauges

tubular and flat glass gauges

accuracy of flat glass gauges

magnetically coupled gauges

float level measuring devices

application of float devices

level/density measurement - force type techniques, including:

comparison of float and displacement type systems

interface sensing devices

torque tube type displacer operation

torque tube type displacer construction

pneumatic and electronic transmitters

level/density measurement - pressure-type techniques, including:

diaphragm level detectors

applications of diaphragm level detectors

differential pressure cells advantages and disadvantages

density measurement using D/P cells

level/density measurement - electrical type techniques, including:

application of conductance probes

operation of a conductivity-level controller

resistance tapes level detectors

capacitance probes level detectors

ultrasonic level detectors

microwave-based level detectors

nucleonic-type level sensors

load cells used for level measurement

level/density measurement - non-intrusive type techniques, including:

radiation-type density sensor

hydrometer element used for density measurement

vibrating tube type liquid density meter

level/density measurement calibration for:

D/P cell calculations

D/P calibration

open tank installation level measurement

problem solutions in density/level measurement systems

relevant job safety assessments or risk mitigation processes, including risk control measures

relevant manufacturer specifications

relevant WHS/OHS legislated requirements

relevant workplace documentation

relevant workplace policies and procedures

safe working practices.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEE Electrotechnology Training Package Companion Volume Implementation Guide.

Density/level measurement apparatus and system, fault finding, maintenance or development work functions must include at least three of the following:

determining the operating parameters of a density/level measuring system

setting up and calibrating a density/level measuring system

altering an existing density/level measuring system to comply with specified operating parameters

developing a density/level measuring system to comply with a specified function and operating parameters

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are obtained and applied 
 
 
 
 
 
WHS/OHS risk control work measures and workplace procedures are followed 
 
 
 
 
 
WHS/OHS work completion risk control measures and workplace procedures are followed 
 
 
 

Forms

Assessment Cover Sheet

UEEIC0038 - Solve problems in density/level measurement components and systems
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEEIC0038 - Solve problems in density/level measurement components and systems

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: