Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEENEEG005B Mapping and Delivery Guide
Verify compliance and functionality of general electrical installations
Version 1.0
Issue Date: April 2024
Qualification | - |
Unit of Competency | UEENEEG005B - Verify compliance and functionality of general electrical installations |
---|---|---|---|
Description | 1) 1.1) This unit covers inspection and testing to verify whether an electrical installation is safe and complies with all requirements. It encompasses working safely, visual inspections and mandatory, optional and functional test procedures, identifying non-compliance defects and mandatory reporting requirements. | ||
Employability Skills | 3)This unit contains Employability SkillsThe required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. | ||
Learning Outcomes and Application | 4) This unit is intended to augment previously acquired competencies. It is suitable for employment-based programs under an approved contract of training.Note: This unit shall not to be used as a sole means of recognition of current competencies for persons seeking the Qualification "Certificate III Electrotechnology Electrician". Those seeking this qualification shall provide evidence of competency specified in all the prerequisite units and this unit to be eligible to receive the qualification. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Prerequisite Unit(s) 2) 2.1) CompetenciesGranting competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed.UEENEEE001B Apply OHS practices in the workplaceUEENEEE002B Dismantle, assemble and fabricate electrotechnology componentsUEENEEE003B Solve problems in extra-low voltage single path circuitsUEENEEE004B Solve problems in multiple path d.c. circuitsUEENEEE005B Fix and secure equipmentUEENEEE007B Use drawings, diagrams, schedules and manualsUEENEEE008B Lay wiring/cabling and terminate accessories for extra-low voltage circuitsUEENEEE033B Document occupational hazards and risks in electrical workUEENEEG001B Solve problems in electromagnetic circuitsUEENEEG002B Solve problems in single and three phase low voltage circuitsUEENEEG003B Install wiring and accessories for low voltage circuitsUEENEEG004B Install low voltage electrical apparatus and associated equipmentUEENEEG007B Select and arrange equipment for general electrical installationsUEENEEG008B Find and repair faults in electrical apparatus and circuitsUEENEEG009B Develop and connect control circuitsand elective units as required from Schedule 3 to a Strand Unit value of 6 Those holding an 'Unrestricted Electrician's Licence' or equivalent issued in an Australian State or Territory meet the requirements of this unit and its pre-requisite requirements.A 'licensed electrician' applying for an 'electrical contractors licence' may be required to undertake this unit to demonstrate their currency with verification of compliance requirements. In this case they are deemed to have met the prerequisites for this unit provided that:they holder a current 'electricians licence' or its equivalent issued in an Australian State or Territory and has recently been in permanent employment as a licensed electrician.For the full prerequisite chain details for this unit please refer to Table 2 in Volume 1, Part 2 | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to inspect and test an electrical installation. |
| |||||||
Element: Visually inspect and conduct safety testing on the installation. |
| |||||||
Element: Report inspection and test findings. |
|