Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEENEEI140A Mapping and Delivery Guide
Plan the electrical installation of integrated systems
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEENEEI140A - Plan the electrical installation of integrated systems |
---|---|---|---|
Description | 1)Scope:1.1) DescriptorThis unit covers the planning and practices in installing an integrated systems. It encompasses working safely, applying knowledge bus system parameters, topology and installation requirements, bus system cables and terminations, control and dimming methods and planning and documenting integrated installation plans. | ||
Employability Skills | 5) This unit contains Employability SkillsThe required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. | ||
Learning Outcomes and Application | 2)This unit is intended as an elective or skill set at AQF 3 level. competencies. It is suitable for employment-based programs under an approved contract of training and may be aligned with a vendor training program that is shown to have the same competency outcomes as this unit. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Prerequisite Unit(s)4) Competencies4.1)Granting of competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed.Where pre-requisite pathways have been identified. All competencies in the Common Unit Group must be have been completed plus all the competencies in one (1) of the identified Pathway Unit Group(s):Electrotechnology ElectricalCommon Unit GroupUnit CodeUnit TitleUEENEEE101A Apply Occupational Health and Safety regulations, codes and practices in the workplaceUEENEEE102A Fabricate, assemble and dismantle utilities industry componentsUEENEEE105A Fix and secure electrotechnology equipmentUEENEEE107A Use drawings, diagrams, schedules, standards, codes and specificationsElectrotechnology Pathway Group Unit CodeUnit TitleUEENEEE108A Lay wiring/cabling and terminate accessories for ELV circuitsElectrical Pathway GroupUnit CodeUnit TitleUEENEEG106A Terminate cables, cords and accessories for low voltage circuitsLiteracy and numeracy skills4.2) Participants are best equipped to achieve competency in this unit if they have reading, writing and numeracy skills indicated by the following scales. Description of each scale is given in Volume 2, Part 3 ‘Literacy and Numeracy’Reading4Writing4Numeracy4 | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Establish integrated system scenario |
| |||||||
Element: Plan integrated system |
| |||||||
Element: Note. Documentation includes explanations of how the customers’ requirement will be achieved; a material list with costs and a marked up floor plan showing relationship of load groups to input devices. | ||||||||
Element: Implement an integrated system installation plan |
|