Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEENEEJ009B Mapping and Delivery Guide
Verify compliance and functionality of refrigeration and air conditioning installations
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEENEEJ009B - Verify compliance and functionality of refrigeration and air conditioning installations |
---|---|---|---|
Description | 1) 1.1) This unit covers testing and visual inspection for verifying that a refrigeration and air conditioning system and components are safe, comply with requirements and functions as intended. It encompasses working safely, conducting compliance tests, conducting visual inspections, identifying non-compliance defects and mandatory reporting requirements. | ||
Employability Skills | 3)This unit contains Employability SkillsThe required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. | ||
Learning Outcomes and Application | 4) This unit is intended to augment previously acquired competencies. It is suitable for employment-based programs under an approved contract of training. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Prerequisite Unit(s) 2) 2.1) CompetenciesGranting competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed.UEENEEE001B Apply OHS practices in the workplaceUEENEEE002B Dismantle, assemble and fabricate electrotechnology componentsUEENEEE003B Solve problems in extra-low voltage single path circuitsUEENEEE005B Fix and secure equipmentUEENEEE007B Use drawings, diagrams, schedules and manualsUEENEEE037B Document occupational hazards and risks in electrotechnologyUEENEEE038B Participate in development and follow a personal competency development planUEENEEJ002B Prepare refrigeration tubing and fittingsUEENEEJ003B Determine the basic operating conditions of vapour compression systemsUEENEEJ004B Determine the basic operating conditions of air conditioning systemsUEENEEJ006B Install pipe work for refrigeration and air conditioning systemsUEENEEJ007B Install refrigeration and air conditioning systems, major components and associated equipmentUEENEEJ008B Recover, pressure and leak test, evacuate and charge refrigerantsUEENEEJ010B Select refrigerant pipe/tube, accessories and associated controlsUEENEEJ011B Diagnose and rectify faults in refrigeration and air conditioning systems and componentsUEENEEJ013B Commission refrigeration and air conditioning systemsUEENEEJ036B Evaluate and report on energy managementUEENEEJ070B Diagnose and rectify faults in refrigeration and air conditioning control systemsUEENEEP001B Disconnect and reconnect fixed wired electrical equipment connected to a low voltage supplyUEENEEP002B Attach cords and plugs to electrical equipment for connection to a single phase 250 volt supplyUEENEEP003B Attach cords and plugs to electrical equipment for connection to 1000 Va.c. or 1500 Vd.c. supplyUEENEEP007B Locate and rectify faults in electrical low voltage equipment following prescribed proceduresAnd elective units from Schedule 3 to a Unit Strand value of 3For the full prerequisite chain details for this unit please refer to Table 2 in Volume 1, Part 2 | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to verify refrigeration and air conditioning installations |
| |||||||
Element: Visually inspect the installation |
| |||||||
Element: Conduct tests |
| |||||||
Element: Report inspection and verification findings |
|