Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEENEEJ067B Mapping and Delivery Guide
Solve problems in central plant air conditioning systems
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEENEEJ067B - Solve problems in central plant air conditioning systems |
---|---|---|---|
Description | 1) 1.1) This unit covers solving problems in central plant air conditioning systems. It encompasses working safely and to standards, applying knowledge of the components and operation of central plant systems, using effective problem solving techniques and documenting solutions. | ||
Employability Skills | 3)This unit contains Employability SkillsThe required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. | ||
Learning Outcomes and Application | 4) This unit is intended to augment previously acquired competencies. It is suitable for employment-based programs under an approved contract of training. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Prerequisite Unit(s) 2) 2.1) CompetenciesGranting competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed.UEENEEJ011B Diagnose and rectify faults in refrigeration and air conditioning systems and componentsUEENEEJ013B Commission refrigeration and air conditioning systemsUEENEEJ007B Install refrigeration and air conditioning systems, major components and associated equipmentUEENEEJ070B Diagnose and rectify faults in refrigeration and air conditioning control systemsUEENEEP007B Locate and rectify faults in electrical low voltage equipment following prescribed proceduresUEENEEJ006B Install pipe work for refrigeration and air conditioning systemsUEENEEJ008B Recover, pressure and leak test, evacuate and charge refrigerantsUEENEEJ002B Prepare refrigerant tubing and fittingsUEENEEJ003B Determine the basic operating conditions of vapour compression systemsUEENEEE002B Dismantle, assemble and fabricate electrotechnology componentsUEENEEJ004B Determine the basic operating conditions of air conditioning systemsUEENEEJ053B Find and rectify faults in appliance motors and associated controlsUEENEEP001B Disconnect and reconnect fixed wired electrical equipment connected to a Low Voltage supplyUEENEEJ006B Install pipe work for refrigeration and air conditioning systemsUEENEEE005B Fix and secure equipmentFor the full prerequisite chain details for this unit please refer to Table 2 in Volume 1, Part 2 | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to solve problems in central plant air conditioning systems |
| |||||||
Element: Solve problems in central plant air conditioning systems |
| |||||||
Element: Note: Examples of information needed to solve problems are system specifications, as-installed drawings, maintenance and service records and measured and calculated values of component operating parameters. |
| |||||||
Element: Complete work and document problem solving activities |
|