Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEENEEJ105A Mapping and Delivery Guide
Position, assemble and start up single head split air conditioning and water heating heat pump systems
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEENEEJ105A - Position, assemble and start up single head split air conditioning and water heating heat pump systems |
---|---|---|---|
Description | 1) 1.1) This unit covers the assembly, installation and starting up and de-commissioning of single head split air conditioning systems andsplit water heating heat pump systems up to a maximum of 18kWr refrigeration capacity. It encompasses working safely and to standards, following routine procedures to install equipment, connecting pipe work, pressure testing, evacuating, perform functional checks and complete installation / regulatory documentation. Note: The Ozone Protection and Synthetic Greenhouse Gas Legislation Amendment Bill 2003 may apply to this unit. Prior to planning the delivery of any training and/or assessment activities all legislative and regulatory requirements shall be identified and included. | ||
Employability Skills | 3)This unit contains Employability SkillsThe required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. | ||
Learning Outcomes and Application | 4) This unit is intended for competency development entry-level employment-based programs incorporated in approved contracts of training. It may also be used to augment previously acquired competencies. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Prerequisite Unit(s)2) 2.1) CompetenciesGranting competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed.UEENEEJ172A Recover, pressure test, evacuate, charge and leak test refrigerants split systemsUEENEEE101A Apply Occupational Health and Safety regulations, codes and practices in the workplaceUEENEEJ102A Prepare and connect refrigerant tubing and fittings | ||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to assemble, install and start up split air conditioning and water heating heat pump systems |
| |||||||
Element: Assemble, install and start up split air conditioning and water heating heat pump systems |
| |||||||
Element: Decommission split air conditioning and water heating heat pump systems |
| |||||||
Element: Test single head split air conditioning and water heating heat pump systems and document |
|