Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEENEEJ108A Mapping and Delivery Guide
Recover, pressure test, evacuate, charge and leak test refrigerants
Version 1.0
Issue Date: April 2024
Qualification | - |
Unit of Competency | UEENEEJ108A - Recover, pressure test, evacuate, charge and leak test refrigerants |
---|---|---|---|
Description | 1) 1.1) This unit covers recovery, pressure testing, evacuating, charging and leak testing recovery of refrigerants and lubricants from refrigeration systems and air conditioning systems. It encompasses working safely and to standards, following regulations and industry practices for handling refrigerants and lubricants, and completing the necessary documentation.Note: Refrigeration systems may be those used for refrigerating or for air conditioning. | ||
Employability Skills | 3)This unit contains Employability SkillsThe required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. | ||
Learning Outcomes and Application | 4) This unit is intended for competency development entry-level employment-based programs incorporated in approved contracts of training and may be used to augment other electrotechnology qualifications at AQF 3 level or higher. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Prerequisite Unit(s)2) 2.1) CompetenciesGranting competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed.UEENEEJ102A Prepare and connect refrigerant tubing and fittingsUEENEEJ103A Establish the basic operating conditions of vapour compression systemsUEENEEE101A Apply Occupational Health and Safety regulations, codes and practices in the workplace | ||
Competency Field | 2.2) Literacy and numeracy skillsParticipants are best equipped to achieve competency in this unit if they have reading, writing and numeracy skills indicated by the following scales. Description of each scale is given in Volume 2, Part 3 'Literacy and Numeracy' Reading 3 Writing 3 Numeracy 3 |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to recover refrigerants, pressure test, evacuate, charge and leak test refrigeration systems. |
| |||||||
Element: Recover refrigerants, pressure test, evacuate, charge and leak test refrigeration systems. |
| |||||||
Element: Complete and report refrigerants recovery, pressure test, evacuate, charge and leak test work |
|