Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEENEEJ113A Mapping and Delivery Guide
Commission air conditioning and refrigeration systems
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEENEEJ113A - Commission air conditioning and refrigeration systems |
---|---|---|---|
Description | 1) 1.1) This unit covers commissioning of refrigeration and air conditioning systems. It encompasses working safely and to standards to commission the whole system and includes pre-commissioning tests, starting up the system, optimizing the refrigerant charge, basic air and water balancing and adjustment, checking and adjusting components and controls to ensure its efficient and balanced operation, and completing commissioning documentation. | ||
Employability Skills | 3)This unit contains Employability SkillsThe required outcomes described in this unit of competency contain applicable facets of Employability Skills. The Employability Skills Summary of the qualification in which this unit of competency is packaged will assist in identifying Employability Skill requirements. | ||
Learning Outcomes and Application | 4) This unit is intended to augment previously acquired competencies. It is suitable for employment-based programs under an approved contract of training. | ||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | Prerequisite Unit(s)2) 2.1) CompetenciesGranting competency in this unit shall be made only after competency in the following unit(s) has/have been confirmed.UEENEEJ107A Install air conditioning and refrigeration systems, major components and associated equipmentUEENEEJ110A Select refrigerant piping, accessories and associated controlsUEENEEP017A Locate and rectify faults in low voltage composite appliances using set proceduresUEENEEE101A Apply Occupational Health and Safety regulations, codes and practices in the workplaceUEENEEE102A Fabricate, assemble and dismantle utilities industry componentsUEENEEE003B Solve problems in extra-low voltage single path circuitsUEENEEE105A Fix and secure electrotechnology equipmentUEENEEE107A Use drawings, diagrams, schedules, standards, codes and specificationsUEENEEE137A Document and apply measures to control OHS risks associated with electrotechnology workUEENEEJ102A Prepare and connect refrigerant tubing and fittingsUEENEEJ103A Establish the basic operating conditions of vapour compression systemsUEENEEJ104A Establish the basic operating conditions of air conditioning systemsUEENEEJ106A Install refrigerant pipe work, flow controls and accessoriesUEENEEJ107A Install air conditioning and refrigeration systems, major components and associated equipmentUEENEEJ108A Recover, pressure test, evacuate, charge and leak test refrigerantsUEENEEJ170A Diagnose and rectify faults in air conditioning and refrigeration control systemsUEENEEJ194A Solve problems in low voltage refrigeration circuitsUEENEEP012A Disconnect / reconnect composite appliances connected to low voltage installation wiringUEENEEP017A Locate and rectify faults in low voltage composite appliances using set procedures | ||
Competency Field | 2.2) Literacy and numeracy skillsParticipants are best equipped to achieve competency in this unit if they have reading, writing and numeracy skills indicated by the following scales. Description of each scale is given in Volume 2, Part 3 'Literacy and Numeracy' Reading 3 Writing 3 Numeracy 3 |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to commission refrigeration and air conditioning systems |
| |||||||
Element: Commission refrigeration systems |
| |||||||
Element: Commission air handling systems |
| |||||||
Element: Note:Components can include fans, chillers, condensers, coils and heat exchangers, boilers and controls |
| |||||||
Element: Note:Components can include chillers, condensers, coils and heat exchangers, boilers, cooling towers, pumps and controls |
| |||||||
Element: Complete and document commissioning work |
|