Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEERA0015 Mapping and Delivery Guide
Design carbon dioxide refrigerated systems
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEERA0015 - Design carbon dioxide refrigerated systems | |
---|---|---|---|---|
Description | ||||
Employability Skills | ||||
Learning Outcomes and Application | This unit involves the skills and knowledge required to design carbon dioxide (CO²) refrigerated systems.It includes applying refrigeration systems, safety and relevant industry standards; developing alternative design schemes based on a design brief and customer requirements; and documenting system design.The skills and knowledge described in this unit may, in some jurisdictions, require a licence or permit to practice in the workplace subject to regulations for undertaking refrigeration and air conditioning work. Practice in the workplace and during training is also subject to work health and safety (WHS)/occupational health and safety (OHS) regulations.No other licensing, legislative or certification requirements apply to this unit at the time of publication. | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
|
|||
Prerequisites/co-requisites | ||||
Competency Field | Refrigeration and air-conditioning |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to design CO² refrigeration systems |
| |||||||
Element: Scope of the refrigeration system is determined from design specifications and/or consultations with relevant person/s | ||||||||
Element: Safety and system are identified, obtained and applied in accordance with relevant industry standards | ||||||||
Element: Work supervisor and/or customer/s are consulted to determine functions and parameters of the system required in accordance with design specifications and workplace documentation | ||||||||
Element: Design development work is planned in accordance with workplace procedures for timelines in consultation with others involved | ||||||||
Element: Design CO² refrigeration systems |
| |||||||
Element: Relevant CO² refrigeration system analysis, components and piping are applied to developing the system design in accordance with workplace procedures and relevant industry standards | ||||||||
Element: Safety, functionality and budgetary considerations are incorporated in the installation specifications | ||||||||
Element: Equipment required is selected in accordance with the design specifications and workplace procedures | ||||||||
Element: Location of components is documented in accordance workplace procedures and operation of system functions | ||||||||
Element: System design draft is checked for compliance in accordance with the design brief and relevant industry standards | ||||||||
Element: System design is documented for submission to relevant person/s for approval | ||||||||
Element: Unplanned events are dealt with in accordance with problem-solving techniques and workplace procedures | ||||||||
Element: Obtain approval for design |
| |||||||
Element: Requests for alterations to the design are negotiated with relevant person/s in accordance with workplace procedures | ||||||||
Element: Final design is documented and approval obtained from relevant person/s in accordance with workplace procedures | ||||||||
Element: Quality of work is monitored in accordance with workplace procedures and relevant industry standards |