Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UEERA0020 Mapping and Delivery Guide
Design complex industrial refrigeration systems and select equipment

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEERA0020 - Design complex industrial refrigeration systems and select equipment
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to design complex industrial refrigeration systems and select equipment.It includes applying system processes and methods of industrial refrigeration systems, safety and relevant industry standards; developing alternative design schemes based on a design brief and customer requirements; and documenting system designs.The skills and knowledge described in this unit may, in some jurisdictions, require a licence or permit to practice in the workplace subject to regulations for undertaking refrigeration and air conditioning work. Practice in the workplace and during training is also subject to work health and safety (WHS)/occupational health and safety (OHS) regulations.No other licensing, legislative or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Assessors must hold credentials specified within the Standards for Registered Training Organisations current at the time of assessment.

Assessment must satisfy the Principles of Assessment and Rules of Evidence and all regulatory requirements included within the Standards for Registered Training Organisations current at the time of assessment.

Assessment must occur in suitable workplace operational situations where it is appropriate to do so; where this is not appropriate, assessment must occur in simulated suitable workplace operational situations that replicate workplace conditions.

Assessment processes and techniques must be appropriate to the language, literacy and numeracy requirements of the work being performed and the needs of the candidate.

Resources for assessment must include access to:

a range of relevant exercises, case studies and/or simulations

relevant and appropriate materials, tools, facilities and equipment currently used in industry

applicable documentation, including workplace procedures, equipment specifications, regulations, codes of practice and operation manuals.

Prerequisites/co-requisites
Competency Field Refrigeration and air-conditioning
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to design complex industrial refrigeration system
  • WHS/OHS requirements and workplace procedures for a given work area are identified, obtained and applied
       
Element: WHS/OHS risk control measures and workplace procedures are followed in preparation for the work
       
Element: Scope of the refrigeration system is determined from the design brief and/or consultations with relevant person/s
       
Element: Design development work is planned in accordance with workplace procedures for timelines in consultation with others involved
       
Element: Design complex industrial refrigeration system
  • Relevant industrial refrigeration system processes and methods are applied to the design
       
Element: Alternative concepts for design are evaluated in accordance with the design brief
       
Element: Safety, functionality and budgetary considerations are incorporated in the design specifications
       
Element: System design draft is checked for compliance in accordance with the design brief and relevant industry standards
       
Element: System design is documented and submitted to relevant person/s for approval in accordance with workplace procedures
       
Element: Unplanned events are dealt with in accordance with problem-solving techniques and workplace procedures
       
Element: Obtain approval for complex industrial refrigeration system design
  • System design is presented to customer and/or relevant person/s in accordance with workplace procedures
       
Element: Requests for alterations to the design are negotiated with relevant person/s in accordance with workplace procedures
       
Element: Final design is documented and approval obtained from relevant person/s in accordance with workplace procedures
       
Element: Quality of work is monitored in accordance with workplace procedures and relevant industry standards
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least one occasion and include:

developing outlines of alternative designs

developing the design within the safety, regulatory, functional requirements and budget limitations

documenting and presenting design effectively

negotiating design alteration requests successfully

obtaining approval for final design

dealing with unplanned events

applying relevant industrial refrigeration system processes and methods

applying relevant work health and safety (WHS)/occupational health and safety (WHS/OHS) requirements, including using rick control measures

designing complex commercial refrigeration system

preparing to design complex industrial refrigeration system.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

complex industrial refrigeration system design, safe working practices and relevant standards, codes and regulations including:

AS/NZS 1677 Refrigerating systems SAA refrigeration code

ANSI/IIAR standards

ANSI/ASHRAE standards

IIAR bulletins

moderate and low temperature industrial refrigeration systems:

direct, flooded and pumped liquid recirculation systems

evaporators

multi-staged compression

direct staging

cascade staging

compound compressors

de-superheaters and liquid injection

direct expansion intercoolers

open and closed intercoolers

basic designs of accumulators/intercooler vessels

oil cooling methods

oil stabilisation, return and oil recovery in flooded systems

multiple evaporators and multiple compressors:

parallel evaporators

multiple temperature systems

evaporator pressure regulators

temperature control methods

parallel compressors

pipe work layout

methods of establishing pressure drop in dry and wet suction lines

indirect refrigeration systems:

classification according to AS/NZS 1677 Refrigerating systems SAA refrigeration code

applications

evaporators

heat exchangers, types, construction and selection

secondary refrigerants

brines

antifreeze solutions

flooded systems:

applications

equipment

accumulators

level controls

liquid recirculation pumps

liquid pressure relief valve

cryogenic systems:

applications and equipment

system components

refrigerants

design safety

economics

cascade systems

basic control sequences:

maintaining evaporator conditions

staging and suction pressure control

maintaining condenser conditions

control of intermediate pressure, methods of industrial refrigeration compressor capacity control

system design:

required cooling capacity per day

running time and required system cooling capacity

system capacity control for peak and low load

refrigeration system diagrams

refrigerant, equipment, major component, controls, piping and accessory selection

problem-solving techniques

relevant job safety assessments or risk mitigation processes

relevant manufacturer specifications

relevant WHS/OHS legislated requirements

relevant workplace budget, quality, policies and procedures

relevant workplace documentation.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEE Electrotechnology Training Package Companion Volume Implementation Guide.

Designing a complex industrial refrigeration system must include at least the following:

one multiple major component, including:

compressors

condenser

evaporators

circuits and/or systems

associated components and controls

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
WHS/OHS requirements and workplace procedures for a given work area are identified, obtained and applied 
 
 
 
Relevant industrial refrigeration system processes and methods are applied to the design 
 
 
 
 
 
System design is presented to customer and/or relevant person/s in accordance with workplace procedures 
 
 
 

Forms

Assessment Cover Sheet

UEERA0020 - Design complex industrial refrigeration systems and select equipment
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEERA0020 - Design complex industrial refrigeration systems and select equipment

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: