Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UEERA0046 Mapping and Delivery Guide
Install and commission ammonia refrigeration systems, components and associated equipment

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEERA0046 - Install and commission ammonia refrigeration systems, components and associated equipment
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to install and commission ammonia refrigeration system, components and associated equipment.It includes installing and commissioning refrigeration equipment using ammonia as the refrigerant. It also includes applying safe working practices and refrigeration principles that apply to ammonia, interpreting plans and specifications, commissioning and completing the necessary commissioning documentation.The skills and knowledgein this unit will be applied by refrigeration and air conditioning technicians during the installation and commissioning of refrigeration systems using ammonia refrigerant.The skills and knowledge described in this unit require a licence or permit to practice in the workplace where work is carried out on electrical installations which are designed to operate at voltages greater than 50 volt (V) alternating current (a.c.) or 120 V direct current (d.c.). Competency development activities in this unit are subject to regulations directly related to licensing. Where a licence or permit to practice is not held, skills and knowledge described in this unit require a relevant contract of training, such as an Australian Apprenticeship. Additional and/or other conditions may apply in some jurisdictions subject to regulations related to refrigeration, air conditioning or electrical work. Practice in the workplace and during training is also subject to work health and safety (WHS)/occupational health and safety (OHS) regulations. Permits may also be required for some work environments, such as confined spaces, working aloft, near live electrical apparatus and site rehabilitation.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Assessors must hold credentials specified within the Standards for Registered Training Organisations current at the time of assessment.

Assessment must satisfy the Principles of Assessment and Rules of Evidence and all regulatory requirements included within the Standards for Registered Training Organisations current at the time of assessment.

Assessment must occur in workplace operational situations where it is appropriate to do so; where this is not appropriate, assessment must occur in simulated workplace operational situations that replicate workplace conditions.

Assessment processes and techniques must be appropriate to the language, literacy and numeracy requirements of the work being performed and the needs of the candidate.

Resources for assessment must include access to:

a range of relevant exercises, case studies and/or other simulations

relevant and appropriate materials, tools, equipment and personal protective equipment (PPE) currently used in industry

resources that reflect current industry practices in relation to installing and commissioning, as well as determining the operating conditions of ammonia vapour compression and liquid recirculation systems

applicable documentation, including workplace procedures, emergency response plan, equipment specifications, regulations, codes of practice and operation manuals.

Prerequisites/co-requisites
Competency Field Refrigeration and air-conditioning
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to install ammonia refrigeration system
  • WHS/OHS hazards, risk control methods, relevant standards, codes and legislation are obtained and applied
       
Element: Safety hazards not previously identified are reported, assessed and advice on risk control measures sought from the project engineer
       
Element: Nature of work is obtained from documentation or from project engineer to determine the scope of work to be undertaken
       
Element: Advice is sought from the project engineer to ensure refrigeration work is coordinated effectively with others
       
Element: Sources of materials required for work are determined in accordance with workplace procedures
       
Element: Tools, equipment and testing devices needed to carry out refrigeration work are obtained and checked for correct operation and safety
       
Element: Install and commission ammonia refrigeration system
  • Measuring system operating parameters are conducted in accordance with WHS/OHS requirements and workplace procedures
       
Element: Major components and pipe work are installed in accordance with relevant industry standards, codes of practice and regulations
       
Element: Pressure testing is conducted at a pressure compatible with ammonia and in accordance with industry standards and practices
       
Element: Precautions are taken to prevent damage to components while pressure testing the system
       
Element: Leaks are located and rectified using testing methods appropriate to the refrigeration system and in accordance with industry standards and practices
       
Element: Refrigeration system is evacuated in accordance with industry standards and practices
       
Element: Refrigeration system is charged safely with ammonia and lubricants in accordance with industry standards and practices
       
Element: Refrigeration pre-operational checks are carried out on operating and safety controls in accordance with manufacturer specifications
       
Element: Refrigeration system is commissioned and adjustments made to operating and safety controls
       
Element: Temperature reduction of cool rooms and freezers are undertaken in accordance with industry standards and practices
       
Element: Refrigeration maintenance is carried out and includes inspection and cleaning of strainers and filters and collection of oil sample for analysis
       
Element: Training is conducted for person/s responsible for the refrigeration system operation and maintenance
       
Element: Complete and report on commissioning of ammonia refrigeration system
  • Worksite is cleaned and made safe in accordance with workplace procedures
       
Element: Contaminated refrigerant and lubricant are dealt with in accordance with legislative/regulatory requirements
       
Element: Refrigeration operation condition and commissioning data are documented and includes parameters not within the specified range for the system
       
Element: Refrigeration mechanical and electrical commissioning documentation is completed in accordance with workplace procedures
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least two separate occasions and include:

applying relevant legislative, industry standards and practices

applying relevant work health and safety (WHS)/occupational health and safety (WHS/OHS) requirements and workplace procedures and practices, including using risk control measures

applying sustainable energy principles and practices

conducting refrigeration system operation and maintenance

dealing with unplanned events/situations in accordance with workplace procedures in a manner that minimises risk to personnel and equipment

discharging/charging refrigerant/lubricants and pressure testing the system without damage to components

documenting operating conditions correctly

identifying the conditions of the ammonia (R717) refrigerant at various locations in the vapour compression and liquid recirculation system

installing, connecting, securing and aligning components and equipment and ensuring that equipment and pipe work is compliant with relevant industry standards, codes of practice and regulations

locating and rectifying leaks

optimising system performance and efficiency

pressure testing entire system at the appropriate design test pressures

pressure testing, charging/discharging refrigerant/lubricants and determining the operating conditions of ammonia vapour compression and liquid recirculation refrigeration system

recording measurements

removing system contaminants and evacuating

selecting and using appropriate measuring devices correctly

using calculation methods accurately

using methodical and efficient commissioning techniques in accordance with workplace procedures.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions and include knowledge of:

cool room and freezer construction, including:

commissioning procedures

construction materials

construction methods

defrost methods

underfloor heating

installation and commissioning techniques for ammonia refrigeration systems

insulation and vapour barrier, including insulation materials and vapour barriers

refrigeration control system testing and adjustment, including:

central programmable logic controller (PLC) system

defrost methods and controls

flow controls

refrigerant level controls

refrigerant pressure controls

temperature controls

refrigerant piping, including:

hydraulic shock

installation principles

material compatibility

pipe sizing principles

pressure testing/evacuation

relief valves

welding

relevant job safety assessments or risk mitigation processes

relevant legislative, industry standards and practices

relevant manufacturer specifications

relevant WHS/OHS legislated requirements

relevant workplace documentation, including reports on installation and commissioning of ammonia refrigeration systems

relevant workplace policies and procedures, including workplace emergency response plan

testing and commissioning ammonia refrigeration systems, including:

air cooled condensers

compressors

direct contact freezing

evaporative condensers

evaporators (air/fluid cooling)

high pressure receivers

secondary refrigerants

start-up and shutdown procedures

water cooled condensers.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEE Electrotechnology Training Package Companion Volume Implementation Guide.

Installing and commissioning ammonia refrigeration system must include at least the following:

determining:

suction and discharge pressures

ambient, evaporator and condensing temperatures

evaporator and condenser temperature difference

critical point of ammonia (R717)

Charging and discharging must include the following:

ammonia (R717) system with refrigerant and lubricant in a safe and environmentally responsible manner

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
WHS/OHS hazards, risk control methods, relevant standards, codes and legislation are obtained and applied 
 
 
 
 
 
Measuring system operating parameters are conducted in accordance with WHS/OHS requirements and workplace procedures 
 
 
 
 
 
 
 
 
 
 
 
Worksite is cleaned and made safe in accordance with workplace procedures 
 
 
 

Forms

Assessment Cover Sheet

UEERA0046 - Install and commission ammonia refrigeration systems, components and associated equipment
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEERA0046 - Install and commission ammonia refrigeration systems, components and associated equipment

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: