UEERA0048 Mapping and Delivery Guide
Install and commission flammable refrigerant air conditioning and refrigeration systems

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEERA0048 - Install and commission flammable refrigerant air conditioning and refrigeration systems
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to install and commission Class A2, A2L and A3 flammable refrigerant air conditioning and refrigeration systems, components and associated equipment in accordance with legislative, standard and code requirements. It includes working safely and installing equipment, components and piping to job specifications. It also includes completing pre-commissioning tests, starting the system, ensuring correct refrigerant charge, adjusting components and controls to efficient operation, completing installation and commissioning documentation.Some flammable refrigerants, for example, fluorocarbons like R32, are controlled under the national Ozone Protection and Synthetic Greenhouse Gas Management Regulations 1995. Therefore, to undertake this unit, the learner must have a relevant Trainee Refrigerant Handling Licence if it includes work on refrigeration and air conditioning equipment that carries the risk of a fluorocarbon refrigerant being emitted.The skills and knowledge described in this unit require a national Refrigerant Handling Licence if it includes work on refrigeration and air conditioning equipment that carries the risk of a fluorocarbon refrigerant being emitted while decanting the refrigerant or manufacturing, installing, commissioning, servicing, maintaining or decommissioning refrigeration and air conditioning equipment.The skills and knowledge described in this unit require a licence or permit to practice in the workplace where work is carried out on electrical installations which are designed to operate at voltages greater than 50 volt (V) alternating current (a.c.) or 120 V direct current (d.c.). Competency development activities in this unit are subject to regulations directly related to licensing. Where a licence or permit to practice is not held, skills and knowledge described in this unit require a relevant contract of training, such as an Australian Apprenticeship. Additional and/or other conditions may apply in some jurisdictions subject to regulations related to refrigeration, air conditioning or electrical work. Practice in the workplace and during training is also subject to work health and safety (WHS)/occupational health and safety (OHS) regulations. Permits may also be required for some work environments, such as confined spaces, working aloft, near live electrical apparatus and site rehabilitation.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Assessors must hold credentials specified within the Standards for Registered Training Organisations current at the time of assessment.

Assessment must satisfy the Principles of Assessment and Rules of Evidence and all regulatory requirements included within the Standards for Registered Training Organisations current at the time of assessment.

Assessment must occur in suitable workplace operational situations where it is appropriate to do so; where this is not appropriate, assessment must occur in simulated suitable workplace operational situations that replicate workplace conditions.

Assessment processes and techniques must be appropriate to the language, literacy and numeracy requirements of the work being performed and the needs of the candidate.

Resources for assessment must include access to:

a range of relevant exercises, case studies and/or simulations

relevant and appropriate materials, tools, facilities and equipment currently used in industry

resources that reflect current industry practices in relation to installing and commissioning flammable refrigerant air conditioning and refrigeration system

applicable documentation, including workplace procedures, equipment specifications, regulations, codes of practice and operation manuals.

Prerequisites/co-requisites
Competency Field Refrigeration and air-conditioning
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to install and commission flammable refrigerant refrigeration and air conditioning systems
  • WHS/OHS hazards, risk control methods, relevant standards, codes and legislation are obtained and applied
       
Element: Safety hazards not previously identified are noted and risk control measures implemented
       
Element: Scope of work is determined from documentation and/or relevant person/s to establish work to be undertaken
       
Element: Component, equipment installation and commissioning work are sequenced in accordance with job schedule
       
Element: Relevant person/s is consulted to ensure the work is coordinated with others involved
       
Element: Materials required to install pipe work are obtained in accordance with workplace procedures and job specifications
       
Element: Tools, equipment and testing devices required to install and commission components and equipment are obtained in accordance with workplace procedures and checked for correct operation and safety
       
Element: System control settings and operating parameters are determined from job specifications
       
Element: Preparatory work is scheduled to ensure no damage has occurred in accordance with workplace procedures and relevant industry standards
       
Element: Install flammable refrigerant refrigeration and air conditioning systems
  • Circuits/machines/plant are checked and isolated in accordance with WHS/OHS requirements and workplace procedures
       
Element: Components and equipment are installed with sufficient access to affect electrical and pipe work connections and maintenance in accordance with relevant legislation, standards and code requirements, manufacturer instructions, job specificationsand workplace procedures
       
Element: Components and equipment are installed in the required locations and within acceptable tolerances in accordance with relevant legislation, standards and code requirements, manufacturer instructions, job specificationsand workplace procedures
       
Element: Refrigerant tubing and fittings are silver brazed with dry nitrogen to prevent contamination in accordance with relevant legislation, standards and code requirements, manufacturer instructions, job specificationsand workplace procedures
       
Element: Unplanned situations from installation of components and equipment are dealt with in accordance with workplace procedures
       
Element: Quality checks of pipe work, pressure testing and repair of leaks are conducted in accordance with relevant legislation, standard and code requirements, manufacturer instructions, job specificationsand workplace procedures
       
Element: Components and equipment are installed efficiently without waste of materials or damage/contamination to apparatus, the surrounding environment or services using sustainable energy practices
       
Element: Commission flammable refrigerant refrigeration and air conditioning systems
  • Installed system’s pipe work and components are evacuated to the required level in accordance with relevant legislation, standards and code requirements and manufacturer instruction
       
Element: System is charged with flammable refrigerant to the required level in accordance with relevant legislation, standard and code requirements, manufacturer instructions and job specification
       
Element: Refrigeration system pressure controls, valves and regulators are adjusted in accordance with relevant legislation, standard and code requirements, manufacturer instructions, job specificationsand workplace procedures
       
Element: Testing/measuring devices are used to observe operation of the refrigeration system and fine adjustments of controls made, as required, in accordance with relevant legislation, standard and code requirements, manufacturer instructions, job specificationsand workplace procedures
       
Element: Unplanned situations are dealt with safely and with the approval of relevant person/s
       
Element: Commissioning is conducted efficiently without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices
       
Element: Complete installation and commissioning work
  • Worksite is cleaned and made safe in accordance with workplace procedures
       
Element: Final check of the installed components and equipment is made in accordance with relevant industry standards and job specifications
       
Element: 'As installed' components and equipment are documented and relevant person/s notified in accordance with workplace procedures
       
Element: Results of commissioning and final operating parameters are documented and relevant person/s notified in accordance with workplace procedures
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions on at least two separate occasions and include:

applying relevant work health and safety (WHS)/occupational health and safety (WHS/OHS) requirements, including using risk control measures

commissioning flammable refrigerants systems

completing installation and commissioning reports and documentation

dealing with unplanned events

discharging/recovering and charging refrigerant/lubricants safely and without damage to components

evacuating the system to the required level safely and without damage to components

identifying the conditions of the refrigerant at various locations

installing flammable refrigerants refrigeration and air conditioning systems

installing, connecting, securing and aligning components and equipment

locating and rectifying leaks

preparing to install and commission flammable refrigerants refrigeration and air conditioning systems

pressure testing the system to the required level safely and without damage to components

reading and interpreting drawings to pipe work layouts and apparatus locations

recording measurements

selecting and using appropriate measuring devices correctly

using commissioning techniques

using sustainable energy principles and practices.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements, performance criteria and range of conditions and include knowledge of:

relevant codes, regulations and standards

relevant manufacturer specifications

relevant safe work method statements (SWMS)/job safety assessments or risk mitigation processes

relevant site arrangements, including pipe work requirements and equipment location

relevant special features for flammable refrigerant systems, including component compatibility, refrigerant leakage and enclosures

relevant system diagrams

relevant WHS/OHS legislated requirements

relevant workplace documentation

relevant workplace quality, policies and procedures

sustainable energy principles and practices

system commissioning requirements and procedures

system, pipe work and component installation requirements and procedures.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEE Electrotechnology Training Package Companion Volume Implementation Guide.

Installing and commissioning major components and associated equipment must include at least the following:

two refrigeration and/or air conditioning systems operating with a flammable refrigerants refrigerant

Major components must include at least the following:

refrigeration compressors

condensers

condensing units

evaporators

Associated equipment must include at least the following:

refrigerant flow controls

cycling controls

safety controls

on-site leak detection equipment

ventilation systems

spark isolation systems and electrical isolation

monitoring equipment

inspection accessories

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
WHS/OHS hazards, risk control methods, relevant standards, codes and legislation are obtained and applied 
 
 
 
 
 
 
 
 
Circuits/machines/plant are checked and isolated in accordance with WHS/OHS requirements and workplace procedures 
 
 
 
 
 
 
Installed system’s pipe work and components are evacuated to the required level in accordance with relevant legislation, standards and code requirements and manufacturer instruction 
 
 
 
 
 
Worksite is cleaned and made safe in accordance with workplace procedures 
 
 
 

Forms

Assessment Cover Sheet

UEERA0048 - Install and commission flammable refrigerant air conditioning and refrigeration systems
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEERA0048 - Install and commission flammable refrigerant air conditioning and refrigeration systems

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: