Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEERE0010 Mapping and Delivery Guide
Design energy management controls for electrical installations in buildings
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEERE0010 - Design energy management controls for electrical installations in buildings | |
---|---|---|---|---|
Description | ||||
Employability Skills | ||||
Learning Outcomes and Application | This unit involves the skills and knowledge required to design energy management controls for electrical installations in new buildings/structures.It includes designing and developing energy management control methods to reduce energy use in new buildings/structures, and documenting strategies to effectively reduce energy use in the completed installation.No licensing, legislative or certification requirements apply to this unit at the time of publication. | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
|
|||
Prerequisites/co-requisites | ||||
Competency Field | Renewable Energy |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Identify energy management techniques for electrical installations in buildings |
| |||||||
Element: Hazards are identified, WHS/OHS risks assessed, and control measures and workplace procedures are implemented in preparation for work | ||||||||
Element: Scope of the energy management electrical design is determined from specifications of building and its services, plant and machinery and in consultation with relevant person/s | ||||||||
Element: Advice is sought from allied trade areas and component suppliers on required energy usage and system design in accordance with manufacturer specifications on energy usage for electrical control system | ||||||||
Element: Advice is sought from work supervisor to ensure work is coordinated effectively with relevant person/s | ||||||||
Element: Tools, testing devices and materials needed to carry out work are obtained and checked for correct operation and safety | ||||||||
Element: Design energy management controls for electrical installations |
| |||||||
Element: Inspection, tests and measurements are carried out in accordance with WHS/OHS requirements and workplace procedures | ||||||||
Element: Energy use of building services, plant and machinery is obtained and applied to the energy management design control process | ||||||||
Element: Energy evaluation tests are set up in accordance with inspection and test methods and workplace procedures | ||||||||
Element: Strategies to reduce electrical system energy use without compromising occupancy standards are developed in accordance with energy management techniques and evaluation test results | ||||||||
Element: Unexpected situations are dealt with safely and effectively in accordance with workplace procedures and approval relevant person | ||||||||
Element: Design and electrical installation evaluation is carried out without unnecessary damage to systems circuits, the surrounding environment or services using sustainable energy practices | ||||||||
Element: Document energy management strategies to effectively reduce energy use in building |
| |||||||
Element: Worksite is cleaned and made safe in accordance with workplace procedures | ||||||||
Element: Results of energy management design controls, recommended electrical installation strategies and their criterion for energy reduction are documented in accordance with workplace procedures | ||||||||
Element: Plans, wiring diagrams and specifications are completed and forwarded to relevant person/s |