UEERE0026 Mapping and Delivery Guide
Conduct checks in the demand side use of remote area power supplies (RAPS)
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEERE0026 - Conduct checks in the demand side use of remote area power supplies (RAPS) | |
---|---|---|---|---|
Description | ||||
Employability Skills | ||||
Learning Outcomes and Application | This unit involves the skills and knowledge required to conduct checks in the demand side use of remote area power supply (RAPS) use.It includes preparing for, completing and reporting on checking of community RAPS use.No licensing, legislative or certification requirements apply to this unit at the time of publication. | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
|
|||
Prerequisites/co-requisites | ||||
Competency Field | Renewable Energy |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to check RAPS system use |
| |||||||
Element: Risk control measures are applied in accordance with workplace procedures prior to commencing work | ||||||||
Element: Risks/hazards are identified, assessed, reported to relevant person/s and control measures implemented | ||||||||
Element: Nature and location of RAPS system is identified from relevant documentation or from relevant person/s to determine the scope of work | ||||||||
Element: Instructions for coordinating work with relevant personnel and the local community are obtained from relevant person/s and applied | ||||||||
Element: Materials required for the work are identified and accessed in accordance with workplace procedures | ||||||||
Element: Tools, equipment and testing devices required for work are obtained and checked for correct operation and safety | ||||||||
Element: Check use of RAPS system |
| |||||||
Element: Need to test or measure live electrical work is determined in accordance with WHS/OHS requirements and conducted in accordance with workplace procedures | ||||||||
Element: Circuits/machines/plant are isolated in accordance with WHS/OHS requirements and workplace procedures | ||||||||
Element: RAPS system testing and checks are conducted in accordance with relevant workplace procedures | ||||||||
Element: Retrieval of performance data is completed safely and in accordance with workplace procedures | ||||||||
Element: Known types of functional faults are identified using fault-finding procedures | ||||||||
Element: Non-routine events are referred to relevant person/s for directions in accordance with workplace procedures | ||||||||
Element: Checking is conducted minimising waste of materials, energy, damage to apparatus, circuits, the surrounding environment and services | ||||||||
Element: Quality checks are conducted in accordance with workplace procedures | ||||||||
Element: Complete check of RAPS system and report outcomes |
| |||||||
Element: Worksite is cleaned and made safe in accordance with workplace procedures | ||||||||
Element: Issues identified during checking are referred to the local community in accordance with workplace procedures | ||||||||
Element: Check results are reported to relevant person/s in accordance with check reporting and workplace procedures |