UEERE0035 Mapping and Delivery Guide
Install ELV stand-alone photovoltaic power systems

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEERE0035 - Install ELV stand-alone photovoltaic power systems
Description
Employability Skills
Learning Outcomes and Application This unit involves the skills and knowledge required to install extra-low voltage (ELV) stand-alone photovoltaic (PV) power systems.It includes preparing to install ELV stand-alone PV power apparatus and systems, installing ELV stand-alone PV power apparatus and system, completing installation and reporting installation activities.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.

Assessors must hold credentials specified within the Standards for Registered Training Organisations current at the time of assessment.

Assessment must satisfy the Principles of Assessment and Rules of Evidence and all regulatory requirements included within the Standards for Registered Training Organisations current at the time of assessment.

Assessment must occur in suitable workplace operational situations where it is appropriate to do so; where this is not appropriate, assessment must occur in suitable simulated workplace operational situations that replicate workplace conditions.

Assessment processes and techniques must be appropriate to the language, literacy and numeracy requirements of the work being performed and the needs of the candidate.

Resources for assessment must include access to:

a range of relevant exercises, case studies and/or other simulations

relevant and appropriate materials, tools, equipment and personal protective equipment (PPE) currently used in industry

applicable documentation, including workplace procedures, equipment specifications, regulations, codes of practice and operation manuals.

Prerequisites/co-requisites
Competency Field Renewable Energy
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to install ELV stand-alone PV power apparatus and systems
  • Work health and safety (WHS)/occupational health and safety (OHS) processes and procedures for relevant work area are identified and applied in accordance with workplace procedures
       
Element: WHS/OHS hazards are identified, risks assessed, reported to relevant person/s and workplace procedures for risk control measures applied in preparation for work
       
Element: System installation is planned in consultation with others impacted by the work and sequenced appropriately
       
Element: Nature and location of the work are determined from documentation or relevant person/s to determine the scope of work
       
Element: Sitting limitations and customer system requirements are identified through consultation with relevant person/s
       
Element: Energy demand is assessed and recommendations made to the customer for energy efficiency improvements, as necessary
       
Element: Suitable system components are specified and selected in accordance with workplace procedures
       
Element: Location of system components is planned within the constraints of the building structure and regulations
       
Element: Instructions for coordinating work with others is obtained from relevant person/s and applied
       
Element: Materials and components required are obtained, pre-assembled, where necessary, and checked against job requirements in accordance with workplace procedures
       
Element: Materials and components are prepared for transport to the site and transport is arranged in accordance with workplace procedures
       
Element: Tools, equipment and testing devices required are obtained in accordance with workplace procedures and checked for correct operation and safety
       
Element: Preparatory work is checked to ensure no unnecessary damage has occurred and complies with requirements
       
Element: Install ELV stand-alone PV power apparatus and systems
  • Equipment is transported safely to site in accordance with workplace procedures
       
Element: Need to test or measure live electrical work is determined in accordance with WHS/OHS requirements and conducted in accordance with workplace procedures
       
Element: Circuits/machines/plant are isolated in accordance with WHS/OHS requirements and workplace procedures
       
Element: System components are installed in compliance with technical industry standards, job specifications and requirements, and with sufficient access to enable terminations, adjustment and maintenance
       
Element: Wiring is terminated at components and associated equipment in accordance with manufacturer specifications and functional and regulatory requirements
       
Element: Unplanned situations are discussed with relevant person/s and responded to in accordance with workplace procedures in a manner that minimises risk to personnel and equipment
       
Element: Checks of installed apparatus quality are conducted in accordance with workplace procedures
       
Element: System installation is conducted minimising waste of materials, damage to apparatus, circuits, the surrounding environment and services using sustainable energy principles
       
Element: Complete installation and report installation activities
  • Worksite is cleaned and made safe in accordance with workplace procedures
       
Element: Final checks are conducted to confirm installed apparatus conforms to requirements
       
Element: System operation is tested and installation verified as compliant with standards and work specifications
       
Element: ‘As-installed’ apparatus and associated equipment are documented and relevant person/s notified in accordance with workplace procedures
       
Element: Customer is informed of system operation, routine maintenance and limitations
       
Element: Documentation required by standards or job specifications is provided to the customer
       


Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria on at least one occasion and include:

assessing customer energy requirements, efficiency improvements and site limitations

reading and interpreting drawings related to and apparatus locations and circuit connections

placing and securing system components accurately

maintaining fire integrity

connecting system components to comply with requirements

testing system operation and verifying compliance with standards and job specifications

completing necessary documentation, including handing over system operational documents to the customer and informing customer of system operation, routine maintenance and limitations

dealing with unplanned events

applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures and practices, including the use of risk control measures

applying sustainable energy principles and practices

checking isolation of circuits/machines/systems

conducting quality checks during installation

coordinating work with relevant person/s

determining live electrical testing/measurement requirements

identifying and accessing materials, tools, equipment and testing devices

installing and setting up stand-alone extra-low voltage (ELV) photovoltaic (PV) power systems.

Evidence required to demonstrate competence in this unit must be relevant to and satisfy all of the requirements of the elements and performance criteria and include knowledge of:

stand-alone ELV PV systems, including:

PV array installation requirements encompassing:

WHS/OHS requirements and methods for working on roofs

common methods of roof construction (rafters and tile battens) and methods to ensure integrity of waterproofing

common types of roof-mounted and free-standing PV array frame construction and methods of tilt angle adjustment

fixing methods for different roof types

array mounting methods for north orientation roof sections and non-north facing roof sections

aesthetic considerations in choosing an appropriate array location and type of mounting

the mounting and fixing methods for at least one type of domestic available building integrated PV product

electrical PV array installation requirements encompassing:

methods used in wiring and connecting PV arrays in accordance with Australian Standards AS/NZS 4509 Stand-alone power systems and AS 5033 Installation and safety requirements for photovoltaic (PV) arrays

considerations involved in wiring of series connected PV modules in order to minimise power losses due to shading

PV array wiring diagram, including the placement of blocking and bypass diodes

considerations involved in choosing the location of associated system equipment, including regulators and direct current (d.c.) control board

cable route from PV array/s to regulators so as to minimise the route length to battery

system installation and maintenance encompassing:

installation work on a PV power system in accordance with relevant standards and WHS/OHS guidelines

correct isolation and shutdown procedures prior to carrying out maintenance tasks

routine maintenance tasks on PV arrays

required vegetation control to remove or reduce shading or soiling on a PV array

relevant manufacturer specifications

relevant safe work method statements (SWMS)/job safety assessments or risk mitigation processes

relevant workplace documentation

relevant workplace policies and procedures.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Range is restricted to essential operating conditions and any other variables essential to the work environment.

Non-essential conditions may be found in the UEE Electrotechnology Training Package Companion Volume Implementation Guide.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work health and safety (WHS)/occupational health and safety (OHS) processes and procedures for relevant work area are identified and applied in accordance with workplace procedures 
 
 
 
 
 
 
 
 
 
 
 
 
Equipment is transported safely to site in accordance with workplace procedures 
 
 
 
 
 
 
 
Worksite is cleaned and made safe in accordance with workplace procedures 
 
 
 
 
 

Forms

Assessment Cover Sheet

UEERE0035 - Install ELV stand-alone photovoltaic power systems
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEERE0035 - Install ELV stand-alone photovoltaic power systems

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: