Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEERE0037 Mapping and Delivery Guide
Install, configure and commission LV micro-hydro systems rated up to 6.4 kW
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEERE0037 - Install, configure and commission LV micro-hydro systems rated up to 6.4 kW | |
---|---|---|---|---|
Description | ||||
Employability Skills | ||||
Learning Outcomes and Application | This unit involves the skills and knowledge required to install, configure and commission low voltage (LV) micro-hydro systems rated up to 6.4 kilowatt (kW).It includes preparing to install LV micro-hydro systems, installing LV micro-hydro systems, and completing and reporting installation activities.The skills and knowledge described in this unit require a licence or permit to practice in the workplace where work is carried out on electrical installations which are designed to operate at voltages greater than 50 volt (V) alternating current (a.c.) or 120 V direct current (d.c).Competency development activities in this unit are subject to regulations directly related to licensing. Where a licence or permit to practice is not held, a relevant contract of training, such as an Australian Apprenticeship, is required.Additional and/or other conditions may apply in some jurisdictions subject to regulations related to electrical work. Practice in the workplace and during training is also subject to work health and safety (WHS)/occupational health and safety (OHS) regulations. | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
|
|||
Prerequisites/co-requisites | ||||
Competency Field | Renewable Energy |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to install LV micro-hydro systems |
| |||||||
Element: WHS/OHS hazards are identified, risks assessed, reported to relevant person/s and workplace procedures for risk control measures applied in preparation for work | ||||||||
Element: System installation is planned in consultation with others impacted by the work and sequenced appropriately | ||||||||
Element: Nature and location of the work are determined from documentation or relevant person/s to determine the scope of work | ||||||||
Element: Location of system components is planned within the constraints of the building structure and regulations | ||||||||
Element: Instructions for coordinating work with others is obtained from relevant person/s and applied | ||||||||
Element: Material required is obtained in accordance with workplace procedures and checked against job requirements | ||||||||
Element: Tools, equipment and testing devices required are obtained in accordance with workplace procedures and checked for correct operation and safety | ||||||||
Element: Preparatory work is checked to ensure no damage has occurred and complies with requirements | ||||||||
Element: Install LV micro-hydro systems |
| |||||||
Element: Circuits/machines/plant are isolated in accordance with WHS/OHS requirements and workplace procedures | ||||||||
Element: System components are installed in compliance with technical standards, job specifications and requirements, and with sufficient access to enable terminations, adjustment and maintenance | ||||||||
Element: Wiring is terminated at system components in accordance with manufacturer specifications and functional and regulatory requirements | ||||||||
Element: Unplanned situations are discussed with relevant person/s and responded to in accordance with workplace procedures in a manner that minimises risk to personnel and equipment | ||||||||
Element: Checks of installed apparatus quality are conducted in accordance with workplace procedures | ||||||||
Element: Apparatus installation is conducted minimising waste of materials, damage to apparatus, circuits, the surrounding environment and services using sustainable energy principles | ||||||||
Element: Complete and report installation activities |
| |||||||
Element: Final checks are conducted to confirm installed apparatus conforms to requirements | ||||||||
Element: ‘As-installed’ apparatus and associated equipment are documented and relevant person/s notified in accordance with workplace procedures |