Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEERE0039 Mapping and Delivery Guide
Install, set up and maintain ELV micro-hydro systems rated up to 6.4 kW
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEERE0039 - Install, set up and maintain ELV micro-hydro systems rated up to 6.4 kW | |
---|---|---|---|---|
Description | ||||
Employability Skills | ||||
Learning Outcomes and Application | This unit involves the skills and knowledge required to install, adjust, set up and maintain extra-low voltage (ELV) micro-hydro systems rated up to 6.4 kilowatt (kW).It includes preparing to install ELV micro-hydro systems, installing ELV micro-hydro systems, and completing and reporting installation activities.No licensing, legislative or certification requirements apply to this unit at the time of publication. | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
|
|||
Prerequisites/co-requisites | ||||
Competency Field | Renewable Energy |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to install ELV micro-hydro systems |
| |||||||
Element: WHS/OHS hazards are identified, risks assessed, reported to relevant person/s and workplace procedures for risk control measures applied in preparation for work | ||||||||
Element: System installation is planned in consultation with others impacted by the work and sequenced appropriately | ||||||||
Element: Nature and location of the work is determined from documentation or relevant person/s to determine the scope of work | ||||||||
Element: Location of system components is planned within the constraints of the building structure and regulations | ||||||||
Element: Instructions for coordinating work with others are obtained from relevant person/s and applied | ||||||||
Element: Materials required are obtained in accordance with workplace procedures and checked against job requirements | ||||||||
Element: Tools, equipment and testing devices required are obtained in accordance with workplace procedures and checked for correct operation and safety | ||||||||
Element: Preparatory work is checked to ensure no damage has occurred and compliance with requirements | ||||||||
Element: Install ELV micro-hydro systems |
| |||||||
Element: Circuits/machines/plant are isolated in accordance with WHS/OHS requirements and workplace procedures | ||||||||
Element: System components are installed in compliance with technical industry standards, job specifications and requirements, and with sufficient access to enable terminations, adjustment and maintenance | ||||||||
Element: Wiring is terminated at system components in accordance with manufacturer specifications and functional and regulatory requirements | ||||||||
Element: Unplanned situations are discussed with relevant person/s and responded to in accordance with workplace procedures in a manner that minimises risk to personnel and equipment | ||||||||
Element: Checks of installed apparatus quality are conducted in accordance with workplace procedures | ||||||||
Element: Apparatus installation is conducted minimising waste of materials, damage to apparatus, circuits, the surrounding environment and services using sustainable energy principles | ||||||||
Element: Complete and report installation activities |
| |||||||
Element: Final checks are conducted to confirm installed apparatus conforms to requirements | ||||||||
Element: 'As-installed' apparatus and associated equipment are documented and relevant person/s notified in accordance with workplace procedures |