Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEERE0055 Mapping and Delivery Guide
Conduct site survey for off-grid photovoltaic/generating set systems
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEERE0055 - Conduct site survey for off-grid photovoltaic/generating set systems |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to conduct site survey |
| |||||||
Element: Work health and safety (WHS)/occupational health and safety (OHS) requirements, relevant legislated requirements, and workplace procedures relevant to site survey are obtained and applied | ||||||||
Element: Equipment and documentation needed for the site inspection are obtained in accordance with workplace procedures | ||||||||
Element: Requirements for site survey and roles/responsibilities of people involved in site survey, design and installation are discussed with client | ||||||||
Element: General information about industry standards, building/electrical regulations and codes, and risk minimisation is provided to client | ||||||||
Element: Advice on the benefits of renewable energy generation systems and energy management is provided to client | ||||||||
Element: Current client energy usage data is collected, and future changes identified | ||||||||
Element: Resources, information sources and other people that will support gathering required site survey information are identified | ||||||||
Element: Undertake and document site survey |
| |||||||
Element: Current and expected future client energy generation needs are discussed, and expectations are clarified | ||||||||
Element: Potential locations of equipment are discussed with client and preferences recorded | ||||||||
Element: Site hazards that may impact installation are identified and documented | ||||||||
Element: Site survey report is prepared and provided to designer in accordance with workplace procedures | ||||||||
Element: Designer, and other qualified person/s if required, are consulted and briefed on client expectations and requirements | ||||||||
Element: Designer, and other qualified person/s if required, are consulted and briefed on site access, conditions, risks and potential installation issues | ||||||||
Element: Options for off-grid energy generation and storage equipment to meet site requirements and client expectations are discussed with designer, and other qualified person/s if required | ||||||||
Element: Placement of system components is considered, and any restrictions or issues of concern noted | ||||||||
Element: Final site survey report is prepared after consultation with designer |