Coordinate the installation, fault finding and repair of micro grid systems

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEERE0058 - Coordinate the installation, fault finding and repair of micro grid systems
Description
Employability Skills
Learning Outcomes and Application
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to coordinate work on micro-grid systems
  • Nature of the installation is verified from design documentation and any design concerns identified referred to designer
       
Element: Work health and safety (WHS)/occupational health and safety (OHS) processes and procedures are identified and applied in accordance with workplace procedures
       
Element: Engagement and scheduling of contractors and other experts required for completion of work is arranged, and roles, responsibilities and levels of authority confirmed
       
Element: Work is planned in consultation with others impacted by the work and sequenced appropriately
       
Element: Location of system components is verified according to design within the constraints of the building structure and regulations
       
Element: Materials, components, tools, equipment and testing devices required are obtained in accordance with workplace procedures and checked for correct operation and safety
       
Element: Live testing, measurement and isolation requirements determined in accordance with WHS/OHS requirements and workplace procedures
       
Element: Coordinate installation of micro-grid systems
  • Circuits/machines/plant are isolated in accordance with WHS/OHS requirements and workplace procedures
       
Element: Transport of equipment to the site is confirmed in accordance with workplace procedures
       
Element: System components are installed by relevant personnel to comply with deign, manufacturer specifications, industry standards and regulatory requirements
       
Element: Installation/construction work of other parties is confirmed as compliant with industry standards, regulations and manufacturer specifications prior to commencing each stage of the project
       
Element: Quality checks of installed apparatus are conducted in accordance with workplace procedures
       
Element: System is programmed by relevant personnel in accordance manufacturer specifications and design
       
Element: Testing and commissioning of the system is conducted in accordance with design documentation, regulations, relevant industry standards and manufacturer specifications
       
Element: Coordinate fault finding and repair of micro-grid systems
  • Nature of reported fault/issue is verified
       
Element: Circuits/apparatus are confirmed as isolated in accordance with WHS/OHS requirements and workplace procedures
       
Element: Fault or faults are diagnosed, faulty equipment is identified, and the replacement products required are documented by relevant personnel
       
Element: System is made safe, faulty apparatus is dismantled, recorded and stored by relevant personnel in accordance with manufacturer guides and stakeholder instructions
       
Element: Repaired or replaced apparatus is assembled by relevant personnel in accordance with manufacturer guidelines, industry standards and regulation
       
Element: Testing and re-commissioning of the system is conducted in accordance with design documentation, regulations, relevant industry standards and manufacturer specifications
       
Element: Complete and report work activities
  • Work area is cleaned and made safe
       
Element: ‘As-installed’ system and associated equipment are documented, manuals produced, and system is handed over to required person/s as per legislation, regulations, industry standards and job requirements
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Nature of the installation is verified from design documentation and any design concerns identified referred to designer 
 
 
 
 
 
 
Circuits/machines/plant are isolated in accordance with WHS/OHS requirements and workplace procedures 
 
 
 
 
 
 
Nature of reported fault/issue is verified 
 
 
 
 
 
Work area is cleaned and made safe 
 

Forms

Assessment Cover Sheet

UEERE0058 - Coordinate the installation, fault finding and repair of micro grid systems
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEERE0058 - Coordinate the installation, fault finding and repair of micro grid systems

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: