Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEERE0072 Mapping and Delivery Guide
Inspect grid connected renewable energy systems
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEERE0072 - Inspect grid connected renewable energy systems |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to conduct grid connected system compliance inspection |
| |||||||
Element: Installation documentation and relevant industry/regulatory standards are reviewed and applied | ||||||||
Element: Inspection checklists are prepared in accordance with relevant industry standards and regulatory requirements | ||||||||
Element: Appropriate person/s is consulted to ensure the work is coordinated effectively with others | ||||||||
Element: Tools, equipment and testing devices to verify compliance are obtained and checked for operation and safety in accordance with workplace procedures | ||||||||
Element: Need to test and measure live electrical work is determined in accordance with WHS/OHS requirements and workplace procedures | ||||||||
Element: Conduct compliance inspection of grid connected renewable energy system |
| |||||||
Element: Inspection of the system is conducted against checklist in accordance with relevant industry standards and regulatory requirements | ||||||||
Element: Electrical equipment compliance with relevant safety requirements and industry standards is obtained from appropriate person/s | ||||||||
Element: Areas of compliance are verified, and non-compliance identified in accordance with relevant industry standards and regulatory requirements | ||||||||
Element: Act and report on grid connected systems inspection findings |
| |||||||
Element: Actions for non-compliance within the scope of inspection responsibilities are determined in accordance with relevant industry standards and regulatory requirements | ||||||||
Element: Inspection report is completed and issued to appropriate person/s in accordance with relevant industry standards and regulatory requirements |