Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners
UEERE0075 Mapping and Delivery Guide
Install and maintain micro hydro energy systems to power conversion equipment
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEERE0075 - Install and maintain micro hydro energy systems to power conversion equipment |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to work on micro-hydro systems |
| |||||||
Element: WHS/OHS hazards are identified, risks assessed, reported to relevant person/s and workplace procedures for risk control measures applied in preparation for work | ||||||||
Element: Nature, scope and location of the work are determined from documentation or relevant person/s | ||||||||
Element: Work is planned in consultation with the customer and others impacted by the work and sequenced appropriately | ||||||||
Element: Engagement and scheduling of contractors and other experts required for completion of work are arranged, and roles, responsibilities and levels of authority confirmed | ||||||||
Element: Materials, components, tools, equipment and testing devices required are obtained in accordance with workplace procedures and checked for correct operation and safety | ||||||||
Element: Live testing, measurement and isolation requirements determined in accordance with WHS/OHS requirements and workplace procedures | ||||||||
Element: Install micro-hydro systems |
| |||||||
Element: Transport of equipment to the site is confirmed in accordance with workplace procedures | ||||||||
Element: Installation/construction work of other parties is confirmed as compliant with industry standards, regulations and manufacturer specifications prior to commencing each stage of the project | ||||||||
Element: Circuits/machines/plant are isolated in accordance with WHS/OHS requirements and workplace procedures | ||||||||
Element: System is installed in compliance with industry standards, regulations and job/manufacturer specifications, and with sufficient access to enable terminations, adjustment and maintenance | ||||||||
Element: Wiring is terminated at components and associated equipment in accordance with manufacturer specifications and functional and regulatory requirements | ||||||||
Element: Quality checks of installed apparatus are conducted in accordance with workplace procedures | ||||||||
Element: Testing and commissioning of the system is conducted in accordance with design documentation, regulations, relevant industry standards and manufacturer specifications | ||||||||
Element: Worksite is cleaned and made safe in accordance with workplace procedures | ||||||||
Element: ‘As-installed’ system and associated equipment are documented, manuals produced, and system is handed over to required person/s as per legislation, regulations, industry standards and job requirements | ||||||||
Element: Maintain micro-hydro systems |
| |||||||
Element: Live testing, measurement and isolation requirements determined and applied in accordance with WHS/OHS requirements and workplace procedures | ||||||||
Element: System is dismantled in accordance with manufacturer guides and instructions from relevant person/s | ||||||||
Element: Component parts are tagged during dismantling to ensure correct and efficient reassembly and stored to protect against loss or damage | ||||||||
Element: System is reassembled in required sequence with all parts placed, secured and connected in accordance with manufacturer guides or industry practice | ||||||||
Element: Repairs are completed in accordance with industry standards, regulations and manufacturer specification | ||||||||
Element: Testing, commissioning and reinstatement of the system is conducted in accordance with design documentation, regulations, relevant industry standards and manufacturer specifications | ||||||||
Element: ‘As-installed’ system and associated equipment are documented, manuals updated, and system is handed over to required person/s as per legislation, regulations, industry standards and job requirements |