Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UEERE0075 Mapping and Delivery Guide
Install and maintain micro hydro energy systems to power conversion equipment

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEERE0075 - Install and maintain micro hydro energy systems to power conversion equipment
Description
Employability Skills
Learning Outcomes and Application
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to work on micro-hydro systems
  • WHS/OHS processes and procedures for relevant work area are identified and applied in accordance with workplace procedures
       
Element: WHS/OHS hazards are identified, risks assessed, reported to relevant person/s and workplace procedures for risk control measures applied in preparation for work
       
Element: Nature, scope and location of the work are determined from documentation or relevant person/s
       
Element: Work is planned in consultation with the customer and others impacted by the work and sequenced appropriately
       
Element: Engagement and scheduling of contractors and other experts required for completion of work are arranged, and roles, responsibilities and levels of authority confirmed
       
Element: Materials, components, tools, equipment and testing devices required are obtained in accordance with workplace procedures and checked for correct operation and safety
       
Element: Live testing, measurement and isolation requirements determined in accordance with WHS/OHS requirements and workplace procedures
       
Element: Install micro-hydro systems
  • Nature of the installation is verified from design documentation and any design concerns identified referred to designer
       
Element: Transport of equipment to the site is confirmed in accordance with workplace procedures
       
Element: Installation/construction work of other parties is confirmed as compliant with industry standards, regulations and manufacturer specifications prior to commencing each stage of the project
       
Element: Circuits/machines/plant are isolated in accordance with WHS/OHS requirements and workplace procedures
       
Element: System is installed in compliance with industry standards, regulations and job/manufacturer specifications, and with sufficient access to enable terminations, adjustment and maintenance
       
Element: Wiring is terminated at components and associated equipment in accordance with manufacturer specifications and functional and regulatory requirements
       
Element: Quality checks of installed apparatus are conducted in accordance with workplace procedures
       
Element: Testing and commissioning of the system is conducted in accordance with design documentation, regulations, relevant industry standards and manufacturer specifications
       
Element: Worksite is cleaned and made safe in accordance with workplace procedures
       
Element: ‘As-installed’ system and associated equipment are documented, manuals produced, and system is handed over to required person/s as per legislation, regulations, industry standards and job requirements
       
Element: Maintain micro-hydro systems
  • Scope and nature of the maintenance is verified from relevant documentation and relevant person/s
       
Element: Live testing, measurement and isolation requirements determined and applied in accordance with WHS/OHS requirements and workplace procedures
       
Element: System is dismantled in accordance with manufacturer guides and instructions from relevant person/s
       
Element: Component parts are tagged during dismantling to ensure correct and efficient reassembly and stored to protect against loss or damage
       
Element: System is reassembled in required sequence with all parts placed, secured and connected in accordance with manufacturer guides or industry practice
       
Element: Repairs are completed in accordance with industry standards, regulations and manufacturer specification
       
Element: Testing, commissioning and reinstatement of the system is conducted in accordance with design documentation, regulations, relevant industry standards and manufacturer specifications
       
Element: ‘As-installed’ system and associated equipment are documented, manuals updated, and system is handed over to required person/s as per legislation, regulations, industry standards and job requirements
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
WHS/OHS processes and procedures for relevant work area are identified and applied in accordance with workplace procedures 
 
 
 
 
 
 
Nature of the installation is verified from design documentation and any design concerns identified referred to designer 
 
 
 
 
 
 
 
 
 
Scope and nature of the maintenance is verified from relevant documentation and relevant person/s 
 
 
 
 
 
 
 

Forms

Assessment Cover Sheet

UEERE0075 - Install and maintain micro hydro energy systems to power conversion equipment
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEERE0075 - Install and maintain micro hydro energy systems to power conversion equipment

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: