UEERE0077 Mapping and Delivery Guide
Install battery storage equipment power conversion equipment to grid
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEERE0077 - Install battery storage equipment power conversion equipment to grid |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Plan for the installation of battery storage equipment PCE to grid |
| |||||||
Element: WHS/OHS processes and procedures for work are identified and applied in accordance with workplace procedures | ||||||||
Element: Hazards associated with battery storage systems are identified and the risk control measures are listed in safe work method statements/job safety analysis | ||||||||
Element: Work is planned in consultation with the customer and others impacted by the work and sequenced appropriately | ||||||||
Element: Designer recommendations, relevant industry standards, regulations and manufacturer specifications are identified and applied to planning the system installation | ||||||||
Element: Materials, tools, equipment and measuring devices required for installation are obtained in accordance with workplace procedures and checked for correct operation and safety | ||||||||
Element: Live testing, measurement and isolation requirements determined and applied in accordance with WHS/OHS requirements and workplace procedures | ||||||||
Element: Install battery storage equipment PCE to grid |
| |||||||
Element: Energy storage system components are installed in compliance with industry standards, regulations and job/manufacturer specifications, and with sufficient access to enable terminations, adjustment and maintenance | ||||||||
Element: Wiring is terminated at components and associated equipment in accordance with manufacturer specifications and functional and regulatory requirements | ||||||||
Element: System components are programmed in accordance with design, relevant industry standards, regulations and manufacturer specifications | ||||||||
Element: Quality checks of installed apparatus are conducted in accordance with workplace procedures | ||||||||
Element: Testing and commissioning of the system is conducted in accordance with design documentation, regulations, relevant industry standards and manufacturer specifications | ||||||||
Element: Worksite is cleaned and made safe in accordance with workplace procedures | ||||||||
Element: ‘As-installed’ system and associated equipment are documented, manuals produced, and system is handed over to required person/s as per legislation, regulations, industry standards and job requirements |