UEERE0079 Mapping and Delivery Guide
Install off-grid power conversion equipment to electrical installation
Version 1.0
Issue Date: May 2024
Qualification | - |
Unit of Competency | UEERE0079 - Install off-grid power conversion equipment to electrical installation |
---|---|---|---|
Description | |||
Employability Skills | |||
Learning Outcomes and Application | |||
Duration and Setting | X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting. |
||
Prerequisites/co-requisites | |||
Competency Field |
Development and validation strategy and guide for assessors and learners | Student Learning Resources | Handouts Activities |
Slides PPT |
Assessment 1 | Assessment 2 | Assessment 3 | Assessment 4 | |
---|---|---|---|---|---|---|---|---|
Elements of Competency | Performance Criteria | |||||||
Element: Prepare to install off-grid power conversion equipment to electrical installation |
| |||||||
Element: WHS/OHS processes and procedures for relevant work area are identified and applied in accordance with workplace procedures | ||||||||
Element: WHS/OHS hazards are identified, risks assessed, reported to relevant person/s and workplace procedures for risk control measures applied in preparation for work | ||||||||
Element: System installation is planned in consultation with others impacted by the work and sequenced appropriately | ||||||||
Element: Location of system components is verified according to design within the constraints of the building structure and regulations | ||||||||
Element: Materials, components, tools, equipment and testing devices required are obtained in accordance with workplace procedures and checked for correct operation and safety | ||||||||
Element: Live testing, measurement and isolation requirements determined in accordance with WHS/OHS requirements and workplace procedures | ||||||||
Element: Install off-grid power conversion equipment to electrical installation |
| |||||||
Element: System components are installed to comply with design, manufacturer specifications, industry standards and regulatory requirements | ||||||||
Element: Wiring is terminated at system components and mandatory tests conducted prior to energisation | ||||||||
Element: Quality checks of installed apparatus are conducted in accordance with workplace procedures | ||||||||
Element: System is programmed in accordance manufacturer specifications and design | ||||||||
Element: Testing and commissioning of the system is conducted in accordance with design documentation, regulations, relevant industry standards and manufacturer specifications | ||||||||
Element: Worksite is cleaned and made safe in accordance with workplace procedures | ||||||||
Element: ‘As-installed’ system and associated equipment are documented, manuals produced, and system is handed over to required person/s as per legislation, regulations, industry standards and job requirements |