Unit of Competency Mapping – Information for Teachers/Assessors – Information for Learners

UEERE0079 Mapping and Delivery Guide
Install off-grid power conversion equipment to electrical installation

Version 1.0
Issue Date: May 2024


Qualification -
Unit of Competency UEERE0079 - Install off-grid power conversion equipment to electrical installation
Description
Employability Skills
Learning Outcomes and Application
Duration and Setting X weeks, nominally xx hours, delivered in a classroom/online/blended learning setting.
Prerequisites/co-requisites
Competency Field
Development and validation strategy and guide for assessors and learners Student Learning Resources Handouts
Activities
Slides
PPT
Assessment 1 Assessment 2 Assessment 3 Assessment 4
Elements of Competency Performance Criteria              
Element: Prepare to install off-grid power conversion equipment to electrical installation
  • Nature of the installation is verified from design documentation and any design concerns identified referred to designer
       
Element: WHS/OHS processes and procedures for relevant work area are identified and applied in accordance with workplace procedures
       
Element: WHS/OHS hazards are identified, risks assessed, reported to relevant person/s and workplace procedures for risk control measures applied in preparation for work
       
Element: System installation is planned in consultation with others impacted by the work and sequenced appropriately
       
Element: Location of system components is verified according to design within the constraints of the building structure and regulations
       
Element: Materials, components, tools, equipment and testing devices required are obtained in accordance with workplace procedures and checked for correct operation and safety
       
Element: Live testing, measurement and isolation requirements determined in accordance with WHS/OHS requirements and workplace procedures
       
Element: Install off-grid power conversion equipment to electrical installation
  • Circuits/machines/plant are isolated in accordance with WHS/OHS requirements and workplace procedures
       
Element: System components are installed to comply with design, manufacturer specifications, industry standards and regulatory requirements
       
Element: Wiring is terminated at system components and mandatory tests conducted prior to energisation
       
Element: Quality checks of installed apparatus are conducted in accordance with workplace procedures
       
Element: System is programmed in accordance manufacturer specifications and design
       
Element: Testing and commissioning of the system is conducted in accordance with design documentation, regulations, relevant industry standards and manufacturer specifications
       
Element: Worksite is cleaned and made safe in accordance with workplace procedures
       
Element: ‘As-installed’ system and associated equipment are documented, manuals produced, and system is handed over to required person/s as per legislation, regulations, industry standards and job requirements
       

Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assignment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Nature of the installation is verified from design documentation and any design concerns identified referred to designer 
 
 
 
 
 
 
Circuits/machines/plant are isolated in accordance with WHS/OHS requirements and workplace procedures 
 
 
 
 
 
 
 

Forms

Assessment Cover Sheet

UEERE0079 - Install off-grid power conversion equipment to electrical installation
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

UEERE0079 - Install off-grid power conversion equipment to electrical installation

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: